Similar Projects
Snow Removal
Infrastructure
Bidding
Louisville, KY 40209

Fort Thomas Treatment Plant Reservoir Solids Hauling Services
Term Contract, Alteration
Bidding
Fort Thomas, KY 41075

Residential Solid Waste and Recycling
Post-Bid
Taylor Mill, KY

Rubber Removal Compound
Post-Bid
Covington, KY 41018

S--Solid Waste and Recycling Columbus, Cincinnati, Chillicothe OH and FT Thomas KY
Results
Fort Thomas, KY - Chillicothe, Cincinnati, Columbus, OH

Solid Waste and Recycling Collection
Results
Covington, KY

Lynn Johnson Slide HP
Infrastructure
Bidding
$39,904 est. value
Gordon, KY 41819

City Wide Trash and Recycled Materials
Post-Bid
Crestview, KY 41076

Disposal and Demolition of a Public Housing Development and Relocation of Tenants
Demolition
Results
Covington, KY 41014

Fort Thomas Treatment Plant Reservoir Solids Disposal
Alteration
Bidding
Fort Thomas, KY 41075

Sludge Removal Services
Post-Bid
Erlanger, KY

Ft. Thomas Treatment Plant Residuals Handling Improvements
Results
Less than $2,177,000 est. value
Fort Thomas, KY 41075

Residential and Commercial Solid Waste Hand Cart Collection, Recycling Collection, and Disposal Services Franchise.
Infrastructure
Bidding
Georgetown, KY

Snow Hauling Services
Post-Bid
Erlanger, KY 41018

Raw Water Reservoir Solids Removal
Results
Less than $4,994,500 est. value
Erlanger, KY

Reported 08/05/2021 12:00 AM
Project Title

Solid Waste Collection (Base Period)

Physical Address View project details and contacts
City, State (County) Mammoth Cave, KY   (Edmonson County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall furnish all labor, supervision, materials, licenses, permits, tools, insurance, transportation, equipment, and container maintenance for refuse collection at Mammoth Cave National Park. Dumpsters and containers listed in the pick-up schedule shall be emptied on each scheduled day. Each refuse container shall be completely emptied of its contents each time the container is scheduled for pick-up. After emptying, the Contractor shall return the dumpsters and other containers to their proper station. Cans shall be lined with a plastic liner, be in an upright position, and have the lid securely in place. Adequate measures shall be taken to prevent spillage of refuse during pick-up operation. All refuse spilled during this operation shall be cleaned up prior to leaving the site. In addition, the Contractor shall collect and dispose of all liter within 10 feet of any dumpster and/or garbage can. The Contractor shall also collect and dispose of all litter encountered while walking to the garbage cans along trails in the developed areas. The Contractor shall notify the COR immediately of any material too large to fit in the dumpster.

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents