Similar Projects
Centrifuge Control Panel Replacement at Robinson Creek WWTP
Post-Bid
Huntsville, TX

Grease Trap Services
Results

R06 Pest Control Services
Term Contract
Post-Bid
Houston, TX 77282

Purchase, Removal and Installation of Influent/Return and Aeration Basin Weir Gates
Renovation, Term Contract
Post-Bid
Huntsville, TX 77340

Camp Bullis Shower Units Lease With Maintenance
Term Contract
Post-Bid

Pest Control Services for Various USAR Facilities In Texas
Term Contract
Results
Amarillo, Bryan, Denton, Fort Worth, Grand Prairie, Huntsville, Lewisville, Lufkin, New Boston, Seagoville, Tyler, TX 75159

Draft: Bardwell Lake Park Cleaning Services
Term Contract
Design
$500,000 to $1,000,000 est. value

RFQ - Professional Services Fiscal Years 2023-2024
Term Contract
Conception
Huntsville, TX 77340

RFQ - Professional Services Fiscal Years 2023-2024
Term Contract
Conception
Huntsville, TX 77340

IH0045 - Emulsion
Term Contract
Sub-Bidding
$218,000 CJ est. value
Huntsville, TX 77320

IH0045 - Cutback
Term Contract
Sub-Bidding
$142,400 CJ est. value
Huntsville, TX 77320

Hazardous Waste Management Services
Term Contract
Sub-Bidding
Huntsville, TX 77340

Maintenance, Repair and Operation Supplies
Term Contract
Sub-Bidding
Huntsville, TX 77340

Ferrous Chloride
Term Contract
Sub-Bidding
Huntsville, TX 77340

Ferrous Chloride
Term Contract
Sub-Bidding
Huntsville, TX 77340

Last Updated 07/28/2022 09:39 AM
Project Title

Sodium Chlorite

Physical Address View project details and contacts
City, State (County) Huntsville, TX 77340   (Walker County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Service/Term Contracts, Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Trinity River Authority (AUTHORITY) Huntsville Regional Water Supply System (HRWSS) and Livingston Regional Water Supply System (LRWSS) is soliciting bids for a two year supply of sodium chlorite used with chlorine to form chlorine dioxide for the purpose of taste and odor control in the water treatment process. Clarification Deadline:8/19/2022 5:00 PM

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents