Similar Projects
Marquette University School of Business and Innovation
New Construction
Design
$60,000,000 est. value
Milwaukee, WI 53233

Karrmann Library HVAC System & Skylight Replacement - GC
Bidding
$3,600,000 est. value
Platteville, WI

Veterinary Medicine - GPC
Renovation, Addition
Bidding
Less than $94,500,000 est. value
Madison, WI 53706

Building L (Centennial Hall, Fitness & Testing Centers) Interior Remodel
Post-Bid
Cleveland, WI 53015

New CDIS Building
New Construction, Addition
Post-Bid
$150,000,000 est. value
Madison, WI 53715

UW Research Lab Room 5018
Renovation
Results
Less than $171,000 est. value
Madison, WI 53705

Custodial Offices Relocation
Results
$160,000 est. value
Oshkosh, WI 54901

Engineering Technology and Electronic Media Lab - GC
Renovation
Bidding
$4,000,000 est. value
Green Bay, WI 54311

Oshkosh Campus Monument Signs
Post-Bid
Oshkosh, WI

Chemistry 2nd Floor Wang Lab Renovation
Renovation
Results
Less than $1,010,000 est. value
Madison, WI 53706

Engineering Technology and Electronic Media Lab - MEP
Renovation
Bidding
$4,000,000 est. value
Green Bay, WI 54311

Manufacturing Education Fab Lab
Addition - 9,950 SF
Post-Bid
Eau Claire, WI 54703

Agricultural Dean's Residence Remodel
Renovation
Results
Less than $335,000 est. value
Madison, WI 53706

Classroom Remodel and AV System Upgrade
Renovation
Bidding
Appleton, WI 54914

Northeast Technical College Outdoor Storage Rack
Post-Bid
Green Bay, WI 54303

Last Updated 03/17/2021 08:49 AM
Project Title

Fryklund Hall Instructional Space Renovation - General

Physical Address View project details and contacts
City, State (County) Menomonie, WI 54751   (Dunn County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,229,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Reconfiguration of approximately 11,056 GSF to accommodate the relocation of the Apparel from Heritage Hall in addition to Engineering Technology space needs. The scope includes updates to classrooms and lab amenities and increase the visibility of the student course work in Fryklund Hall and Communication Technology buildings. The remodel of these spaces includes the following scope: Removal of an existing General Classroom from Level 3 Fryklund Hall. Reconfiguration of an existing CADD Lab, Sketch Lab and Apparel Production Lab on Level Fryklund Hall into the following: Maker Labs CADD Lab conference Room Reconfigure of an existing Lab on Level 2 Comm Tech into the following: Maker Lab Testing Lab

Details

College/University, Approximately 11,056 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents