Similar Projects
Rushmore Loan Management Services - Interior Renovations
Renovation - 78,000 SF
Conception
$5,000,000 est. value
Irving, TX 75063

West Love Office Tower II
New Construction
Conception
Dallas, TX 75235

Ladybird Building
Renovation - 10,044 SF
Design
Dallas, TX 75229

Mockingbird Lane Office Development
New Construction, Infrastructure - 150,000 SF
Design
$32,000,000 CJ est. value
Dallas, TX 75235

The Assembly
New Construction - 980,000 SF
Post-Bid
$10,000,000 CJ est. value
Dallas, TX 75226

Carbon Pump Station Reconstruction
Demolition, New Construction, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Irving, TX 75038

Trinity Mills Station Phase I
New Construction - 125,000 SF
Results
$10,000,000 CJ est. value
Carrollton, TX 75006

Lake Highlands Trail Phase II - A and B and Lake Highlands Northern Extension - Site Development
Infrastructure
Results
$4,392,297 est. value
Dallas, TX

Weir's Plaza Office Building
New Construction
Construction
Dallas, TX 75205

Buckingham Road Development
New Construction - 38,900 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Richardson, TX 75081

Huntington Townhomes
Demolition, New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Richardson, TX 75080

Haven at Waterview / Richardson
New Construction, Infrastructure - 300,212 SF
Pending Verification
$90,000,000 CJ est. value
Richardson, TX 75081

Maple Avenue Apartments
New Construction, Infrastructure
Design
$3,600,000 CJ est. value
Dallas, TX 75235

Replacement of Fire Station 41
New Construction, Infrastructure - 8,248 SF
Post-Bid
$4,208,000 CJ est. value
Dallas, TX 75230

Demolition and Renovations to George Allen Courthouse 7th Floor Probate Court
Demolition, Renovation, Infrastructure
Results
$10,948,634 CJ est. value
Dallas, TX 75202

Last Updated 11/04/2022 10:48 AM
Project Title

Wildlife Phase III-Building 12

Physical Address View project details and contacts
City, State (County) Grand Prairie, TX 75050   (Dallas County)
Category(s) Commercial, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Office, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $27,626,610 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a 502,320 square foot office/warehouse building, being fully sprinklered with an ESFR System and having tilt-up concrete exterior walls and steel roof structure. As of November 4, 2022, this project is in final planning and no building permits have been applied for yet. An architect has been selected. Neither a general contractor nor a selection method has yet been disclosed. A firm construction timeline has not yet been established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

502,320 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents