Similar Projects
City Club Apartments Lafayette Park
Renovation
Conception
$25,000,000 est. value
Detroit, MI 48207

Williams Street Condominiums
New Construction
Conception
South Haven, MI

Municipal Swimming Pool
Bidding
Litchfield, MI 49252

Grand Ledge High School Pool Remodel
Bidding
Grand Ledge, MI

Construction of a 40,000 sf Pool Addition to the Existing High School
Post-Bid
Jackson, MI

Bouw’S Pool Sandblasting
Post-Bid
Holland, MI

Pool Surface Replacement
Results
Big Rapids, MI 49307

Pool Repairs
Results
Troy, MI

Island Resort and Casino Expansion
Renovation, Addition - 408,520 SF
Construction
$33,000,000 est. value
Harris, MI 49845

City Line Apartments
New Construction
Construction
Kentwood, MI 49548

Alvin Norlin Splash Pad
Addition
Pending Verification
$364,000 est. value
Imlay City, MI

W T Morris Memorial Swimming Pool
Renovation
Pending Verification
Saint Louis, MI 48880

Veridian Shores - Single Family Homes & Duplexes
New Construction
Conception
Muskegon, MI 49440

Seitz Middle School Pool Addition and Entry Improvements at Huntington Elementary School.
Post-Bid
Riverview, MI 48193

Holly Area Schools Holly High School Pool Improvements
Results
Holly, MI 48442

Last Updated 03/19/2021 12:46 AM
Project Title

Botsford Pool Remarcite and Opening

Physical Address View project details and contacts
City, State (County) Livonia, MI 48152   (Wayne County)
Category(s) Entertainment/Recreation
Sub-Category(s) Swimming Pool(s)
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Drain pool taking precaution to prevent uplift. Pool was installed in water bearing soil. Debris shall be disposed of by contractor 2. Remove all existing marcite and lane line tile and targets, exposing concrete foundation according to state and federal guidelines. Pool marcite demolition material shall be legally disposed of. Contractor is responsible for providing dumpsters if needed. 3. Reuse main drain covers. 4. Clean and prep foundation concrete for proper application of marcite, including repair of any broken steps 5. Apply a scratch coat 6. Apply Diamond Brit or approved equivalent 7. Replace six (6) lane line tile and targets using 2-inch x 2-inch tiles. Color Black or Navy Blue. 8. Upon completion of marcite coat, filling of the pool to begin 9. Contractor shall provide an option to truck in 50,000 or 100,000 gallons of water 10. Job site shall be cleaned and cleared to ready space for operation to public Opening of Municipal Pool 1. Opening of pool shall be completed upon completion of marcite and filling. 2. Pool gutter shall be cleaned and flushed. This water shall run to waste and not through the filtration system 3. Main drain covers shall be inspected when pool is drained for condition and expiration dates. 4. Service contractor shall clean filter tank, both wet and dry compartments. Contractor shall also inspect condition of sand and report to Aquatics Coordinator of condition. Including new gaskets on filter tanks. Contractor shall repair pressure gauges and pneumatic valves as needed. City reserves the right to remove the gauge and valve repair and deduct cost from lump sum of opening costs 5. Service contractor shall clean filter tank, both wet and dry compartments. Contractor shall also inspect condition of sand and report to Aquatics Coordinator of condition. Including new gaskets on filter tanks. Contractor shall repair pressure gauges and pneumatic valves as needed. City reserves the right to remove the gauge and valve repair and deduct cost from lump sum of opening costs 6. Service contractor shall install any guard rails, ladders, steps, etc. 7. Service contractor shall have clear communication with Aquatics Coordinator regarding the status of pools

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing.
Division 09 - Finishes, Special Coatings, Cementitious Coatings.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 26 - Electrical, Special Purpose Lighting, Underwater Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents