Similar Projects
MLK & Coralie Single Family Homes
New Construction
Design
North Las Vegas, NV 89032

Silverado Ranch Boulevard - Jones Boulevard To Arville Street - Phase A
Bidding
$7,851,626 to $8,678,112 est. value
NV

Hollywood Regional Park: Site Improvements Hollywood Regional Park: SNPLMA Walking Trail
Renovation
Bidding
$19,928,860 to $20,977,749 est. value
NV

Indefinite Quantity (Idiq) Multiple Award Construction Contract (Macc) For Paving Projects At Various Government Installations Within The Navfac Sw Area Of Responsibility Including But Not Limited To California, Arizona, Nevada, Utah, Colorado, And New Mex
Post-Bid

Maryland Parkway Bus Rapid Transit (BRT)
Post-Bid
$160,000,000 to $180,000,000 est. value
Las Vegas, NV

Z--Canal Construction, Repair And Replacement Indefinite Delivery / Indefinite Qua
Results

Slurry Seal
Results
$1,850,000 to $2,200,000 est. value
NV

Union Village LLC Public Park
New Construction
Construction
Henderson, NV 89011

Nobila - Via Inspirada to Las Vegas Boulevard
Infrastructure
Bidding
$53,500 est. value
Henderson, NV

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Chip Seal
Results
$2,200,000 to $2,650,000 est. value
NV

Fort Apache Road, Huntington Cove Parkway to Warm Springs Road
Infrastructure
Bidding
$7,506,263 to $8,296,397 est. value
Las Vegas, NV

FWRC Secondary Treatment Expansion Preloading
Post-Bid
$10,100,000 to $11,700,000 est. value
Las Vegas, NV

Pavement Maintenance and Site Improvements
Results
$225,000 est. value
Las Vegas, NV 89131

Pinto Lane Streetscape Improvements Phase 1 - Shadow Lane To Martin Luther King Boulevard
Alteration
Bidding
$3,218,624 to $3,894,535 est. value
Las Vegas, NV

Last Updated 06/15/2021 09:54 AM
Project Title

Nellis Meadows: Park Improvements Irrigation Renovation and North Parking Lot Rehabilitation

Physical Address View project details and contacts
City, State (County) Las Vegas, NV   (Clark County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,966,543 to $5,227,941
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

cope #1 – Nellis Meadows: Park Improvements (RP.B0119093) The "Project" of which the "Work" of the Contract is a part titled Nellis Meadows: Park Improvements and is located at 4949 E. Cheyenne Ave., Las Vegas, Nevada. The "Work" is described in the Project Drawings and Divisions 1 through 48 of the Project Manual. Work consists of the improvements and renovation of an existing 19-acre park as detailed below. Work includes Owner's general requirements pertaining to contract administration and construction coordination as contained in Division 1 - General Requirements of the project specifications. Contractor shall include all labor, materials, equipment, engineering, permitting and services necessary to construct the project per approved plans and specifications. Construction consists of but is not limited to the following: Demolition and removal of the existing baseball field, demolition and removal of an existing restroom building, demolition and removal of the existing lift station; installation of concrete sidewalks and concrete curbing; installation of a pre-manufactured modular building including all amenities and all utilities; installation of a new pre-manufactured concrete restroom building including all amenities and all utilities; removal and replacement of existing sports light fixtures on existing poles; installation of new sports lights and poles; installation of new plant material and irrigation. installation of new potable water supply lines; installation of a new sewage lift station; new sewer connection for the modular building and the new restroom building as specified. Scope #2 – Nellis Meadows: Irrigation Renovation (RP.B0117023) The "Project" of which the "Work" of the Contract is a part titled Nellis Meadows: Irrigation Renovation and is located at 4949 E. Cheyenne Ave., Las Vegas, Nevada. The "Work" is described in the Project Drawings and Divisions 1 through 48 of the Project Manual. Work consists of replacement of existing irrigation system replacement and selective landscape improvements of a 19-acre existing park. Work includes Owner's general requirements pertaining to contract administration and construction coordination as contained in Division 1 - General Requirements of the project specifications. Contractor shall include all labor, materials, equipment, engineering, permitting and services necessary to construct the project per approved plans and specifications. Construction consists of but is not limited to the following: Abandonment of entire existing irrigation; installation of a new irrigation system; repair and replacement of any turf damaged during the irrigation installation as specified. Scope #3 – Nellis Meadows: North Parking Lot Rehabilitation (RP.B0115040) The "Project" of which the "Work" of the Contract is a part titled Nellis Meadows: North Parking Lot Rehabilitation and is located at 4949 E. Cheyenne Ave., Las Vegas, Nevada. The "Work" is described in the Project Drawings and Divisions 1 through 48 of the Project Manual. The Work consists of repaving an approximately 36,000 sf of existing north parking lot of an existing 19 acres park. Work includes Owner's general requirements pertaining to contract administration and construction coordination as contained in Division 1 - General Requirements of the project specifications. Contractor shall include all labor, materials, equipment, engineering, permitting and services necessary to construct the project per approved plans and specifications. Construction consists of but is not limited to the following: Site preparation; asphalt pavement, base and subbase removal; forming and installation of concrete curbing; grading, construction of parking lot pavement and base, installation of a concrete valley gutter; pavement striping and painting; parking lot signage replacement, parking block replacement, and other work as shown on the contract documents for the Nellis Meadows Park North Parking Lot project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions.
Division 03 - Concrete.
Division 06 - Wood, Plastics, and Composites.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Selective Clearing, Grading, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents