Similar Projects
D/B Western MATOC
Design
$1,000,000 to $70,000,000 est. value

Pacific West Area Indefinite Quantity Contract for Construction Services
Design
$2,000 to $25,000,000 est. value

Defense Health Agency - Medical Facility Operations and Maintenance
Bidding
$2,500 to $90,000,000 est. value

Design-Build a Ground Based Strategic Deterrent (GBSD) Software Sustainment Center
New Construction - 17,214 SF
Post-Bid
$100,000,000 to $250,000,000 est. value
Ogden, UT

Archery Building Phase II
Post-Bid
Ogden, UT 84401

Army Mechanical MATOC
Results
Less than $2,000,000 est. value

Air Force Contract Augmentation Program (AFCAP) V
Results

Access Control Point Program Design Build II -- RFI(2)
Design

New Washington County Administration Building
New Construction - 141,702 SF
Post-Bid
Less than $15,000,000 est. value
Saint George, UT

Two-Phase Design-Build Ground Based Strategic Deterrent Mission Integration Facility (GBSD)
New Construction - 140,000 SF
Results
$25,000,000 to $100,000,000 est. value
Ogden, UT 84056

Indefinite Delivery / Indefinite Quantity (IDIQ) Global Contingency Construction (GCC) Multiple Award Contract (MAC)
Design
Less than $5,000,000,000 est. value

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Post-Bid
$3,000,000 to $15,000,000,000 est. value

CMc Services for IRS Service Center Limited Scope Modernization
New Construction
Results
$30,000,000 to $40,000,000 est. value
Farr West, UT 84404

SB Fuels Multiple Award Task Order Contract (MATOC)
Design
Less than $349,000,000 est. value
Washington, DC

Construction Inspection IDIQ
Post-Bid
$50,000 to $17,500,000 est. value

Last Updated 01/13/2021 12:21 PM
Project Title

Hill AFB East Gate Canopy & Inspection Facility

Physical Address View project details and contacts
City, State (County) Ogden, UT 84056   (Weber County)
Category(s) Government/Public, Single Trades
Sub-Category(s) Finishes/Exterior, Misc. Buildings
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The design of the East Gate consists of providing a new canopy in the Access Control Zone and Approach Zone. The incoming traffic will require to go through the curved lane unless it is being inspected in the Approach Zone. The Security Forces are going to be able to park their vehicles in the Approach Zone and then walk to the inspection area through a sidewalk. A shelter is also provided in the inspection zone. As vehicles travel through the Response zone, the inbound lane is curved to ensure guards have nine seconds of response time to deploy the active vehicle gates. The passive vehicle barriers, listed in the most recent DoD Anti-RAM list, shall be situated around the perimeter of the East Gate. The outbound lane follows the same curvature as the inbound lane through the Response and Access Control Zones. In the Approach Zone, the outbound lane is minimally impacted. The existing chain-link fence and gate are modified according to the new geometry of the inbound and outbound lanes. The project also consists of providing a generator pad for emergency backup power and providing a connecting point to the existing automatic transfer switch for the critical power systems and existing pop-up vehicle wedge barriers. The uninterruptable power supply is required for many electronic systems and the active vehicle barrier. Other electrical systems needed are an IDS and CCTV infrastructure. And a new advanced meter is required. A new full set of traffic signs for the East Gate and City of Layton are needed. The traffic signs go all the way to the intersection of Fairfield Rd and 6th St. Also, a new set of luminaries with lighting protection shall be constructed for the East Gate and in the City of Layton. The construction of the project will be divided into two phases to allow one lane open at all times. Precise grading that ties into the existing terrain is crucial for the success of the project. The existing infrastructure, such as the asphalt, chain-link fence, booths, and buildings in the Access Control Zone shall be incorporated into the construction. Demolition shall be performed as needed to tie-in the new features to the existing infrastructure.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Entrances, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents