Similar Projects
Last Updated | 03/14/2022 01:09 AM |
Project Title | Mosinee, 4th Street and Main Street, Pine Street - Wisconsin River Bridge |
Physical Address | View project details and contacts |
City, State (County) | WI (Marathon County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Mosinee, 4th Street and Main Street, Pine Street - Wisconsin River Bridge; Mosinee, Western Avenue and 4th Street, Rangeline Road - Pine Street; C. Mosinee, Western and 4th, Rangeline Road - Pine Street; Marathon County; 6370- 01-73, WISC 2021 485; 6370-01-75, WISC 2021 486; 6370-01-76; STH 153; 1.499 Miles; Grading, Base, Milling, Asphalt Pavement, Concrete Pavement Repair, Storm Sewer, Curb and Gutter, Sidewalk, Concrete Driveway, Traffic Signals, Signs, Pavement Markings, and Water Service Excavation Common, 1,287 CY; Base Aggregate Dense, 2,795 Ton; Marking Epoxy, 33,094 LF; Marking Paint, 7,090 LF; Construction Staking, 21,248 LF; Construction Staking, 81 Each; Construction Staking, 3 LS; Conduit, 708 LF; Storm Sewer Pipe, 24 LF 12”, 114 LF 15”; Concrete Curb, 239 LF; Concrete Curb and Gutter, 12,206 LF; Concrete Sidewalk, 22,358 SF; Asphaltic Surface, 714 Ton; HMA Pavement, 8,381 Ton; Removing Asphaltic Surface Milling, 37,400 SY; Tack Coat, 4,520 Gals; Signs, 677 SF; Concrete Driveway, 856 SY; Concrete Pavement Replacement 198 SY, Traffic Signal Standards, 5 Each; Water Service, 1,440 LF. |
||||||||||||||||||||
Details | Bridge, New Construction.
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |