Similar Projects
Last Updated | 08/03/2022 01:14 AM |
Project Title | 39 Road Culvert Removal and Replacement |
Physical Address | View project details and contacts |
City, State (County) | Haring charter Township, MI 49663 (Wexford County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Shoreline/Erosion/Drainage, Site Development |
Contracting Method | Competitive Bids. |
Project Status | Results, |
Bids Due | View project details and contacts |
Estimated Value | $2,000,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | For 39 Road Culvert Removal and Replacement All materials and all work will be in accordance with the 2012 MDOT Standard Specifications for Construction. Insurance requirements shall be in accordance with the 2012 MDOT Standard Specifications for Construction. Award is contingent upon Board approval. The Wexford County Road Commission, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Sub-Title A, Office the Secretary, Part 21, Nondiscrimination in Federally assisted programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively insure that in any contact entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. The Board reserves the right to reject any or all bids or any part of the same, to waive irregularities and/or informalities and to make the award in part or entirety in any manner deemed to be in the best interest of the Wexford County Road Commission. Culvert Replacement, Buttermilk Creek, Liberty Township, Section 32, Wexford County, Michigan. This crossing is located approximately 1/4 mile south of the 39 Road & 12 Road intersection. Culvert remove and replace: Removal of the 2 existing 30" CMP. Placement of 48 Lft of 10' x 4' Concrete Box Culvert on 4 Road, over Buttermilk Creek, Liberty Township, Section 32 The work of this contract involves the removal of the existing culvert and placement of a new concrete box culvert per the attached plans. The contractor will be responsible for all items of work listed in the Bid Proposal and shown in the plans, including dewatering. The contractor will provide a plan to control the flow of water during construction of the box culvert. This dewatering plan must be approved by the Road Commission Engineer prior to any construction on this project. The cost of dewatering to be included in the Lump Sum price of culvert replacement. The contractor will need to provide traffic control and may construct the structure part width while maintaining traffic or complete the project in less than 14 days of road closure time. If the contractor chooses to close the road it must be performed according to MMUTCD including Type 3 barricades and Road Closed to Through Traffic signs with advance warning at the nearest intersections and Type 3 barricades and road closed signs at the culvert location. Contractor is responsible for proper signing and to maintain safe construction area at the location until the roadway is open to traffic. |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |