Similar Projects
Replace and Upgrade to 12" Main on 12th Street Marian to Laird - City of Hastings
Infrastructure
Conception
$300,000 CJ est. value
Hastings, NE 68901

Replace and Upgrade to 12" Main on 12th Street Marian to Laird - City of Hastings
Infrastructure
Conception
$300,000 CJ est. value
Hastings, NE 68901

WashTech Car Wash / Hastings
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Hastings, NE 68901

2023 Resurfacing Project - Concrete Phase
Infrastructure
Bidding
$700,000 CJ est. value
Hastings, NE 68901

Installation of Underground Ducts for Feeders 281, 282, 284 and 285
Infrastructure
Bidding
$400,000 CJ est. value
Hastings, NE 68901

Lochland Country Club Poolhouse
Demolition, New Construction, Renovation, Infrastructure
Post-Bid
$250,000 CJ est. value
Hastings, NE 68901

GTS Officers Quarters Building 635
New Construction, Infrastructure
Post-Bid
$366,800 CJ est. value
Hastings, NE 68901

Water Main Improvement
Infrastructure
Results
Hastings, NE 68902

District 4 On-Call Util Location Service
Infrastructure
Results
Less than $5,000,000 est. value

Heartwell Renewables Diesel Production Plant
New Construction, Infrastructure
Construction
$10,000,000 CJ est. value
Hastings, NE 68901

Replace and Upgrade Main on Marian Road from 7th Street to 9th Street - City of Hastings
Infrastructure
Conception
$350,000 CJ est. value
Hastings, NE 68901

NEARNG GTS Sanitary Sewer
Infrastructure
Bidding
$600,000 CJ est. value
Hastings, NE 68901

Construction of Feeder 242 and Installation of Underground Feeders
Infrastructure
Post-Bid
$300,000 CJ est. value
Hastings, NE 68901

Watermain and Service Replacements
Infrastructure
Results
Hastings, NE

7th Street - Chestnut Avenue to Oswego Avenue - City of Hastings
Infrastructure
Conception
$390,000 CJ est. value
Hastings, NE 68901

Last Updated 02/13/2023 08:47 AM
Project Title

Coal Train Pump Station

Physical Address View project details and contacts
City, State (County) Hastings, NE 68901   (Adams County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $433,685 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

For Coal Train Pump Station Keith Miller Engineer Ph# 402-462-3549 Email: bidquestions@cityofhastings.org Renae Griess Engineering Admin Assistant Ph# 402-462-3665 Email: bidquestions@cityofhastings.org Brief description of project: Supply and install a wet well pumping station along with 6500+ of 4 force main piping, 12,600 of 1 polyduct, 235 of 8 gravity sewer and 1 manhole. Each bid shall be accompanied by a certified check, drawn on a solvent bank in the State of Nebraska, or a bid bond in an amount of not less than five percent (5%) of the total bid of all contract construction costs, made payable to the City Treasurer of the City of Hastings, Nebraska, as security that the bidder to whom the contract may be awarded will enter into a contract to build all the improvements in accordance with this notice and give bond in the sum hereinafter provided for the construction of improvements. No bid shall be withdrawn after opening of bids without the consent of the City of Hastings, Nebraska, for a period of sixty (60) days after scheduled time of closing bids. Time is of the essence in this contract. In evaluating bid(s) received, the City will consider the timelines of completion of prior construction contracts, existing workload of bidders and available manpower that bidder commits to the project. The successful bidder will be required to furnish a Maintenance Bond in the sum of the full amount of the Contract within ten (10) days of the date of award. No additional time will be allowed the Contractor for providing the Maintenance Bond.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents