Similar Projects
Last Updated | 10/16/2023 09:43 PM |
Project Title | Ascpl Elevator 6 Modernization |
Physical Address | View project details and contacts |
City, State (County) | Akron, OH 44326 (Summit County) |
Category(s) | Single Trades |
Sub-Category(s) | Conveying Systems |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected November 2023 |
Bids Due | View project details and contacts |
Estimated Value | $395,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Question Deadline 10/16/2023 at 3:00 PM ET All questions concerning the project shall be directed by email to Liz Ritter at lizritter3651@gmail.com. The last day to submit questions This project a turnkey modernization and 12-month warranty maintenance service for one (1) Traction Elevator installed at the Akron-Summit County Public Library. The Akron-Summit County Public Library reserves the right to reject any and all bids and any part or parts of any bid, and also the right to waive any informalities in the bid. Elevator #6 at Akron-Summit County Public Library is a basement traction passenger unit in a simplex operating configuration. The elevator described below is receiving a full turnkey modernization as per the criteria described in this specification. This modernization will include the removal and replacement of the existing controller, machine, drive, hoistway wiring, governor, hoist ropes, fixtures, and other related equipment. The rated lifting capacity and travel speed shall be maintained. The cost for warranty maintenance of the elevators, as per the language contained in this specification, is to be included in the base bid amount. The warranty maintenance will commence upon turnover and will continue for twelve (12) consecutive months from the Akron-Summit County Public Library's acceptance of the modernized elevators. The full-service warranty maintenance includes regular time service calls, a two-hour response time to service calls, and the special billing rates noted above. If the 2-hour response time requirement is not met the service call will not be billable regardless of the nature of the call. ELEVATOR SYSTEM INCLUDED IN MODERNIZATION PROJECT Passenger Elevator State ID #18513 Basement Traction Machine Capacity: 2000lbs Speed: 150 fpm Machine Location: Basement Operational Control: Simplex Power Supply: 208v Scope of Work Retain Existing Capacity: 2000Lb Retain Existing Class Loading: Passenger Class A Retain Existing Car Speed: 150fpm Retain Existing Machine Location: Basement Retain Existing Operational Control: Simplex Retain Existing Power Supply: 208v Retain Existing Landings: 6 Retain Existing Openings: 6 Retain Existing Travel: Approximately 71'9" Machine Room Components Provide New Microprocessor Control System Provide New Drive Provide New Machine Room Wiring Provide New Hollister Whitney 44 basement machine or Torin TGDIB-2020-SC or like machine Provide New 15HP 1200 RPM AC Hoist Motor Provide New Governor Provide New Ascending Car Protection Existing unit on Emergency Power Door Equipment Provide New door operator, door clutch, door restrictors Provide New 2 speed car door panels Provide New infrared full screen door protection device Provide New hoistway door panels, closers, drives, interlocks, hangers, tracks and headers Car and Hall Fixtures Provide New code compliant applied #4 stainless steel car operating panel Provide New digital position indicator in the car operating panel Provide New Firefighters Service Phase I and II Provide New Handsfree Communication Device Provide New #4 stainless steel in car lantern Provide New Hall Station Position Indicator Combination @ 1 st Floor #4 Stainless Steel Finish Provide New hoistway access switch at top and bottom floors Provide New Hall Pushbutton Stations Surface Mounted Vandal Resistant #4 Stainless Steel Finish Install escutcheons at all floors (currently at two lowest landings only) Car & Hoistway Equipment Retain existing platform and sling Thoroughly clean guide rails Provide New hoistway wiring including a dual travel cable configuration Provide New digital landing system Provide New car top inspection station and light Provide New car top railing system Provide New cab fan Provide New governor tension sheave Provide New ELSCO car roller guides Provide New ELSCO counterweight roller guides Provide New 5/8" hoist ropes Provide New pit ladder Refurbish pit equipment (buffers, channels, etc) and paint Provide New fascia (as needed) Cab Interior Paint interior of cab and refinish any surfaces as needed Provide New fan Provide New emergency exit switch Provide New ceiling Provide New flooring |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |