Similar Projects
FY21 Dock Repair - Apostle Islands National Lakeshore
Design
$500,000 to $1,000,000 est. value
Bayfield, WI

St. Croix Shores Boathouse - Stairs
Design
$500,000 to $1,000,000 est. value
Saint Croix Falls, WI 54024

Dike Surface Repairs
Bidding
$50,000 est. value
Whitewater, WI 53190

La Crosse Cruise Ship Landing-Riverside Park
Bidding
$2,586,000 est. value
La Crosse, WI

J--Dock Repair
Post-Bid
$250,000 to $500,000 est. value
Bayfield, WI

126' Aluminum Truss Dock
Post-Bid
Scandinavia, WI 54977

Boat Launch Repair
Results
Less than $360,000 est. value
Madison, WI 53703

Cotton Mill Park Fishing Platforms and Kayak Launch
Addition
Results
Beaver Dam, WI 53916

Seasonal Removal and Installation of Dock
Post-Bid
De Soto, WI 54624

Courtesy Dock and Ramp
Results
Prescott, WI 54021

Pewaukee Lake Boat Launch Reconstruction
Post-Bid
Pewaukee, WI 53072

Instrumentation for Prestressing Miter Gate Diagonals - Lock & Dam 4
Results
Alma, WI 54610

Boat Landing Improvements
Post-Bid
Wauzeka, WI

Pine Lake Boat Launch Access Improvements
Results
Chenequa, WI

Saint Croix Shores Boathouse - Stairs Project
Post-Bid
$500,000 to $1,000,000 est. value
Saint Croix Falls, WI 54024

Last Updated 04/28/2021 09:09 AM
Project Title

Fountain City Service Base Phase II Design Build

Physical Address View project details and contacts
City, State (County) Fountain City, WI   (Buffalo County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Design-Build. Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work under the contract includes: Reviewing the Corps’ documentation on the condition of the current river front as well as any unique site conditions which may impact the design requirements. Design. Designing a straight-line mooring system, to include two (2) additional crane cells for the Corps’ 200-ton heavy lift crane, raising the grade on the southern portion of the site to bring it level with the current crane cell, improved shore lighting, providing the Corps the ability to dock their fleet directly against the vertical face, and provide shore power and water to the vessels. Fabrication and installation of the system. Work will include dredging and earthwork to allow for installation of the quayside, constructing the mooring solution (ex: forming and pouring concrete or driving pile), anchoring the vertical face into the current riverbed to support crane loads, and running power and water lines to the new quayside.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Dredging, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents