Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$460,000 CJ est. value
Scott, PA 17815

Bridge over Long Run
Infrastructure
Conception
$2,901,442 CJ est. value
Porter Township, PA 17751

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$2,139,878 CJ est. value
Franklin Township, PA 16001

SR 1003 - Brady Twp Line to SR 1001
Infrastructure
Design
$2,899,132 CJ est. value
Henderson Township, PA 16652

Center Street, Hall Street - Milling of Bituminous Paving, Warm Mix Asphalt (WMA) Binder Course and Wearing Course
Infrastructure
Bidding
$300,000 CJ est. value
Leidy Township, PA 17764

Milling of Bituminous Paving
Infrastructure
Bidding
$200,000 CJ est. value
Renovo, PA 17764

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

2-Part Pipe Project on Fox Hollow Road T-332
Infrastructure
Post-Bid
Mill Hall, PA 17751

Construction of New Water Mains and Connections
Results
Loganton, PA 17747

Replace Water Line - PA
Term Contract
Results
Lamar, PA

Snook Road Bridge Rehabilitation Project
Infrastructure
Construction
$193,080 CJ est. value
Greene Township, PA 17747

T-664 over German Run
Infrastructure
Conception
$1,545,000 CJ est. value
Lock Haven, PA 17745

Alleghenyville Road (SR 3024) over I-176
Infrastructure
Design
$5,713,010 CJ est. value
Brecknock Township, PA 19540

Pipe Crossing on Fox Hallow Road T-332 and A Pipe Crossing on Browns Hill Road T-333
Infrastructure
Post-Bid
Mill Hall, PA 17751

Mackey and McElhattan Avenues Waterline Replacements
Infrastructure
Results
$400,000 est. value
Castanea, PA 17745

Last Updated 10/05/2022 12:35 AM
Project Title

Harley Drive Sewer Replacement

Physical Address View project details and contacts
City, State (County) Lock Haven, PA 17745   (Clinton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $123,590 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: This project will include the removal and disposal of the existing 15" diameter Asbestos Cement Pipe (ACP) on a 250 linear foot run of sanitary sewer. The existing ACP will be replaced with 15" diameter PVC between the two existing manholes. Within the sewer run there is a crossing under a seasonal stream, within the stream banks the new pipe will be encased in a steel casing pipe, then the casing pipe concrete encased. Each bid shall be accompanied by a certified check or bid bond in the amount of 10 percent (10%) of the maximum amount of the bid, as a guarantee that the bidder will execute the contract and furnish the necessary bonds if the contract is awarded to him/her. Bids shall be sealed in an opaque envelope and clearly marked as a bid for the Project. The envelope must also bear the name and address of the bidder. Each bid must be accompanied by a certified check or bid bond in the amount of ten (10%) percent of the total bid, as a guarantee that the bidder will execute the contract and furnish the necessary bonds if the contract is awarded to him/her. A Performance and Payment Bond, each in the amount of one hundred percent (100%) of the estimated contract price, shall be required from the Successful Bidder. The Supplementary Conditions set forth requirements for the payment by the Contractor and all Subcontractors of minimum wage rates for all classes of laborers and mechanics as set forth by all applicable provisions of the PA Prevailing Wage Act, and the Bid shall be prepared accordingly. The Pine Creek Municipal Authority reserves the right to waive any irregularities and to reject any and all bids and to award either contract to the lowest responsible bidder for the total of all lump sum items. No bidder may withdraw his or her bid within sixty (60) days after the actual opening thereof.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents