Similar Projects
Highway 5 Gas Station
New Construction, Infrastructure
Conception
$600,000 CJ est. value
Douglasville, GA 30135

Highway 5 Gas Station
New Construction, Infrastructure
Conception
$600,000 CJ est. value
Douglasville, GA 30135

The Westin Hotel and Conference Center at Foxhall Resort
New Construction, Infrastructure
Design
$180,000,000 CJ est. value
Douglasville, GA 30135

The Westin Hotel and Conference Center at Foxhall Resort
New Construction, Infrastructure
Design
$180,000,000 CJ est. value
Douglasville, GA 30135

Spine Road New Location Construction Project
Infrastructure
Bidding
$300,000 CJ est. value
Douglasville, GA 30134

Spine Road New Location Construction Project
Infrastructure
Bidding
$300,000 CJ est. value
Douglasville, GA 30134

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Douglasville-Douglas County Water & Sewer Authority Administrative Building Addition/Renovation - 100% CD
Addition, Demolition, Infrastructure, Renovation - 37,809 SF
Post-Bid
$3,850,000 CJ est. value
Douglasville, GA 30134

Patching, Milling and Resurfacing of Various Roads
Infrastructure
Results
Douglasville, GA

Improvements at West Pines Golf Club
Infrastructure
Results
$250,000 CJ est. value
Douglasville, GA 30134

Cobb Tunnel Sewer Connection
Renovation, Infrastructure
Construction
$6,407,915 CJ est. value
Douglasville, GA 30134

Microsoft Data Center / Douglasville
New Construction, Infrastructure
Construction
$50,000,000 CJ est. value
Douglasville, GA 30135

Astoria at Crystal Lake
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Douglasville, GA 30134

Oakmont Skyview Drive Warehouse
New Construction, Infrastructure - 181,430 SF
Pending Verification
$20,000,000 CJ est. value
Lithia Springs, GA 30122

Heron Mill
New Construction, Infrastructure
Conception
$165,000,000 CJ est. value
Douglasville, GA 30122

Last Updated 12/20/2023 09:32 AM
Project Title

Fairburn Road Improvement Project Phase II

Physical Address View project details and contacts
City, State (County) Douglasville, GA 30135   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $8,454,704 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

AS of December 18, 2023, the project has not been awarded. A timeline for award has not been confirmed. Reference Number 0000325837 The project is located on Fairburn Road, starting at Cascade Road, and continuing to North Utoy Creek. The typical section includes 12-ft travel lanes, curb and gutter, a 10-ft multi-use path on the west side and a 6-ft wide sidewalk behind a 2-ft stamped concrete strip on the east side of Fairburn Road. Improvements also include bridge replacements at North and South Utoy Creek with bottomless culverts, turning lanes at the Fairburn Road/Cascade. Deadline 10/24/2023 at 3:00 PM ET Questions are submitted online Yes If you have any questions, please our website or contact the agent of concern. All Bidders, and a , post a Bid of five percent (5%) of the bid price, a of one hundred ten percent (110%) of the bid price and a of one hundred percent (100%)

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents