Similar Projects
Last Updated | 05/18/2021 10:13 AM |
Project Title | Partial Roofing Replacement and Repairs at Frank J. Dugan Elementary School, Phase 2 |
Physical Address | View project details and contacts |
City, State (County) | Marlboro, NJ 07746 (Monmouth County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,100,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Roofing removal and replacement of roof area No. 7 with fiberglass asphalt shingle roofing system assembly and all associated work. Provide and install pre-finished aluminum metal drip, rake edge and dormer step flashing. Provide and install pre-finished aluminum metal gutters and downspouts. Provide and install pre-finished aluminum metal snow guards. Provide and install pre-finished aluminum metal open valley flashing. Provide and install roof ridge exhaust vent with ridge cap shingles. Provide new stainless steel mechanically keyed thru-wall counterflashing, brick masonry to match the existing, weepholes, cavity wall insulation. Provide and install 2 one half No. lead vent pipe flashing. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |