Similar Projects
Pinto Campus IT Operations Data Center Chiller Replacement
Alteration
Bidding
$1,076,350 to $1,133,000 est. value
Las Vegas, NV 89106

J045--Chiller Comprehensive Service and Maintenance
Post-Bid

Fume Hood
Post-Bid
Las Vegas, NV

SWRF Untreated Air Pipe Replacement
Results
$1,225,000 est. value
Henderson, NV

West Charleston Building C - 2nd Floor HVAC Replacement Phase A
Results
$319,000 est. value
Las Vegas, North Las Vegas, NV 89146

Replace Ductwork In Dehumidifiers
Post-Bid
Las Vegas, Nelson, NV

West Flamingo Senior Center Pool Locker Room HVAC Upgrade
Results
$126,350 to $133,000 est. value
Las Vegas, NV

45--Supply and Replace HVAC Units
Post-Bid
Bullhead City, AZ - Boulder City, Echo Bay, NV 89005

UNLV CBC-C 1st and 2nd Floor Repipe
Results
$820,000 est. value
Las Vegas, NV 89154

Cooling Tower Maintenance and Repair Services
Post-Bid
North Las Vegas, NV 89121

Big Bend Water Treatment Plant Ozone Generator Room HVAC Upgrade
Results
$185,000 est. value
Las Vegas, NV

Replace HVAC Controls and Roof Fredric W Watson Elementary School
Post-Bid
$310,000 est. value
North Las Vegas, NV 89031

Replace HVAC Components and Roof - Elizabeth Wilhelm Elementary
Results
$2,250,000 est. value
North Las Vegas, NV 89031

Replace HVAC Components and Roof - Dean La Mar Allen Elementary School
Results
$1,830,000 est. value
Las Vegas, NV 89121

Cooling Tower and Boiler Replacement
Results
Las Vegas, NV 89121

Last Updated 07/02/2021 08:53 AM
Project Title

HVAC Improvements at Terminal 1 Bridge/Rotunda

Physical Address View project details and contacts
City, State (County) Las Vegas, NV   (Clark County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes the demolition four Air Handling Units (AHUs); these AHUs will be replaced with three AHUs AHU-BR-01, AHU-BR-06, AHU-BR-09, and AHU-BR-10. Existing Variable Air Volume (VAV) boxes downstream of AHU-BR-09 will be replaced and new ductwork will be required. A new exterior roll-up door and stairs will be added for maintenance access. The existing Motor Control Center (MCC) will be demolished and all circuits will be moved over to another MCC (MCC-A).

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents