Similar Projects
Labonte Park Pond - City of Laramie
Infrastructure
Conception
$430,000 CJ est. value
Laramie, WY 82072

Snow Removal Services
Term Contract
Post-Bid
Cheyenne, WY 82001

Blacktail Timber Stand Improvement Project
Term Contract
Post-Bid
Cheyenne, WY 82001

House Foundation and Shop Site Demolition and Reclamation
Demolition, Infrastructure
Sub-Bidding
$30,000 CJ est. value
Cheyenne, WY 82001

Asbestos Abatement Civic Units 5, 6, and 7
Alteration
Post-Bid
Casper, WY 82601

Solid Waste Exit Scale
Infrastructure
Results
$200,820 CJ est. value
Evansville, WY 82636

Roof Abatement at Midwest School (2023)
Term Contract, Infrastructure
Post-Bid
$70,000 CJ est. value
Midwest, WY 82643

2022 Crack Seal Project
Infrastructure
Post-Bid
$220,000 CJ est. value
Sheridan, WY 82801

Sheridan Game Bird Farm Removal, Disposal and Replacement of Overhead Poultry Netting
Infrastructure
Sub-Bidding
$80,000 CJ est. value
Sheridan, WY 82801

Water Treatment Plant: Chlorine Gas, Liquid Ferric Sulfate, and Dry Polymer
Term Contract
Sub-Bidding
Green River, WY 82935

252-254 E Simpson Demolition and Reclamation Project
Demolition, Infrastructure
Post-Bid
$200,000 CJ est. value
Jackson, WY 83001

Last Updated 01/25/2023 03:38 PM
Project Title

Frontier Learning Center Demolition

Physical Address View project details and contacts
City, State (County) Cheyenne, WY 82007   (Laramie County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $149,605 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Frontier Learning Center Demolition, 610 West 7th Street, Cheyenne, Wyoming, 82007. The Project consists of the demolition of an entire building (including asbestos abatement and hazardous material removal), parking lot, select concrete pavements, light poles, select trees, and sewer and water lines, creating and following Stormwater Pollution Prevention plan and the construction of concrete sidewalk, curb and gutter, topsoil hauling, grading, and hydro-seeding. Pursuant to Wyoming State Statues 16-6-102 and 16-6-103 the contract will be let to the responsible certified resident making the lowest bid if the certified resident s bid is not more than five percent (5%) higher than that of the lowest responsible non-resident bidder. Pursuant to Wyoming State Statues 16-6-104, and 16-6-106, preference is hereby given to materials, supplies, agricultural products, equipment, machinery and provisions produced, manufactured or grown in Wyoming, or supplied by a resident of the state, quality being equal to articles offered by the competitors outside of the state. The Owner reserves the right to waive irregularities and informalities in the bidding or in any bid, reject any or all bids without further obligation and to accept any bid deemed in the best interest of Laramie County School District Number One. Questions regarding clarification or interpretation of the bid documents shall be addressed in writing to: Tobin and Associates, P.C. 2232 Dell Range Boulevard, Suite 303 Cheyenne, Wyoming, 82003 terrell@tobin-assoc.com

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents