Similar Projects
Historic County Courthouse
Renovation
Conception
Provo, UT 84601

Administration Building
Renovation
Conception
Provo, UT 84606

Downtown City Hall Redevelopment
Design
Provo, UT 84606

City Hall Renovation
Renovation - 60,000 SF
Design
West Jordan, UT 84088

General Contractor Services
New Construction
Bidding
Blanding, UT

New Washington County Administration Building
New Construction - 141,702 SF
Post-Bid
Less than $15,000,000 est. value
Saint George, UT

New Washington County Administration Building
New Construction - 141,702 SF
Post-Bid
Less than $15,000,000 est. value
Saint George, UT

DFCM Construction-Pre Qualified General-Matheson Courts OFA Remodel
Renovation
Results
Less than $160,000 est. value
Salt Lake City, UT 84111

Construction Manager as Constructor (CMC) Services - Frank E. Moss Courthouse Seismic Upgrades, Backfill, & Building Renovation
Renovation
Results
$75,000,000 to $90,000,000 est. value
Salt Lake City, UT

Cannonville Town Hall and Medical Center Addition
Addition - 3,475 SF
Construction
Cannonville, UT

Construction Management/General Contractor (CM/GC) Services for a New Santaquin City Hall
New Construction
Construction
Less than $6,000,000 est. value
Santaquin, UT 84655

Security Center Complex
New Construction, Renovation
Conception
Spanish Fork, UT 84660

AOC Manti Sixth District Courthouse
New Construction
Design
Manti, UT 84642

Addition to The Central Valley Town Clerk/Treasurer
Post-Bid
Central, UT 84754

Construction of Honeyville City Hall
New Construction
Results
Honeyville, UT 84314

Reported 02/02/2022 12:00 AM
Project Title

Justice Court Renovation

Physical Address View project details and contacts
City, State (County) West Valley City, UT 84119   (Salt Lake County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes demolition of 2 floors of existing office space proximately 20,600 S.F. Reconstructing and installation of upgraded interior. Finishes, millwork, walls, stairway, courtroom components, power, data, lighting, AV systems, HVAC system, plumbing fixtures, security systems and controls on levels 1 and 2. Selective demolition for new plumbing fixtures/drain lines, new roof openings for solar fixtures, and new floor/shear wall penetrations, infill of abandoned openings. New components and systems are current technology. Elevator finishes & controls will be upgraded. Finishes include glass rail system, acoustic treatments, fire-rated areas, built-in planters, and fine wood work. Project includes high secure areas and elements. A new secured entrance will include replacement of a portion of the exterior curtainwall system with steel supports and ADA door operators.

Details

Capitol/Court House/City Hall, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents