Similar Projects
New Pump Station
New Construction
Conception
$974,500 est. value
Waterloo, WI

Myrick Pump Station Improvements - 500 - City of La Crosse
Renovation, Infrastructure
Conception
$3,000,000 CJ est. value
La Crosse, WI 54601

Waupun Central Generating Plant (CGP) Water System Improvements - GPC
Infrastructure, Renovation
Bidding
$6,000,000 CJ est. value
Waupun, WI 53963

Petenwell Park West End Expansion Area Adams County Parks And Recreation
New Construction, Infrastructure
Bidding
$500,000 CJ est. value
Arkdale, WI 54613

Big Buck Lift Station Improvements Phase I
Post-Bid
Kenosha, WI 53142

Well House #2 Improvements Rebid
Infrastructure, Renovation
Post-Bid
$1,608,966 CJ est. value
Kendall, WI 54638

Jefferson Street Storm Lift Station
New Construction
Results
$50,000 est. value
Portage, WI 53901

Town Line Road Cast in Place Storage Tank and Booster Station
Renovation, Infrastructure
Results
Menomonee Falls, WI

Sal St. & Industrial Dr. Sanitary Sewer Rehab - SS11 - Village of Bellevue
Renovation, Infrastructure
Conception
$860,000 CJ est. value
Bellevue, WI 54302

2023 Sanitary Pump Station Upgrades
Renovation
Bidding
$200,000 CJ est. value
Waukesha, WI 53186

Landfill Lift Station Modifications
Renovation
Post-Bid
Appleton, WI 54911

Lift Station Rehabilitation
Renovation
Results
Rosholt, WI

Rehabilitation of the Green Island Sanitary Lift Station - 611 - City of La Crosse
Renovation
Conception
$550,000 CJ est. value
La Crosse, WI 54601

45th Avenue and 63rd Avenue Lift Station Replacements
Renovation
Bidding
$2,000,000 CJ est. value
Kenosha, WI 53142

Solid Waste Station And Recycling Transfer Station Hauling
Renovation
Post-Bid
WI

Last Updated 03/15/2023 11:01 AM
Project Title

Eau Claire River Lift Station Rehabiliation

Physical Address View project details and contacts
City, State (County) Altoona, WI 54720   (Eau Claire County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $3,033,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Questions regarding the bid documents should be directed to Donohue & Associates attention: Eric Lynne (Telephone 952-920-1811, email elynne@donohue-associates.com. The Work of this Contract is generally described as the removal and replacement of the existing wastewater pumps, process valves and piping within the Wet Well and Dry Well of the lift station. Removal and replacement of the ventilation system throughout the building and adding a dehumidification system. Interior rehabilitation work to include but not limited to removal of existing paint and falling ceiling tiles and painting the walls, ceiling and piping. Removal of the existing grit blower and installing a new grit blower in the generator room and installing new blower piping and valves from this blower to the proposed diffusers in the Wet Well. Installing a 24-inch forcemain isolation valve and future bypass connection in the Dry Well. Installing a new Automatic Transfer Switch and Main Disconnect. Sequencing work shall be done to minimize the disruption and to maintain the operation of the lift station. Bypass pumping and piping of the influent flow into the lift station will be required to perform portions of this rehabilitation work.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents