Similar Projects
Water System Interconnect Upgrades
Bidding
Pompano Beach, FL

BCJC Jail Water Meter Reconfiguration
Sub-Bidding
Fort Lauderdale, FL 33301

Water Service Line Replacement
Post-Bid
Less than $600,000 est. value
Coral Springs, FL

Parkside Water Main Replacement Project
Post-Bid
Hollywood, FL

Sanitary Sewer/ Storm Drain Maintenance and Repair
Term Contract
Results
Lauderdale-by-the-Sea, FL 33308

Sanitary Sewer Manhole Rehabilitation, Annual Contract
Term Contract
Results
Pompano Beach, FL 33060

South Middle River Forcemain Crossing Design Build
Term Contract
Construction
Less than $45,000 est. value
Fort Lauderdale, FL 33301

Gravity Sewer System Condition Assessment and Renewal and Replacement (Inflow/Infiltration - I/I) Excavated Point Repairs
Post-Bid
Hollywood, FL 33022

Cured in Place Pipe Rehabilitation, Annual Contract
Term Contract
Results
Pompano Beach, FL 33060

Fire Hydrants and Accessories
Term Contract
Post-Bid
Fort Lauderdale, FL 33301

Mecca Force Main Extension Project
Results
Fort Lauderdale, FL 33301

Civil Work Related to Taft Street Force Main Condition Assessment
Post-Bid
Hollywood, FL 33022

Directional Boring Services
Results
Sunrise, FL

Infiltration and Inflow Removal Phase 2A Lateral Repairs
Post-Bid
Hallandale, FL 33009

Water Meter, Register, and Transmitter Change-Out
Results
Plantation, FL 33317

Last Updated 09/24/2020 10:03 AM
Project Title

Raw Water Well #9 Pipeline

Physical Address View project details and contacts
City, State (County) Hallandale, FL 33009   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes the Contractor furnishing all labor, materials, tools, equipment, machinery, and service necessary for the construction and installation of approximately 3,000 LF of new 12” raw water pipeline from Production Well No. 9 (PW-9) (designed by others) to an interconnection with the existing 12” raw water pipeline at Production Well No. 8 (PW-8). The work also includes the construction of approximately 565 LF of new 8” gravity sewer pipe within the Ansin Boulevard, which will replace an existing section of gravity sewer piping.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents