Similar Projects
Sugar Creek Charter School Expansion
New Construction
Conception
Charlotte, NC 28213

EE Smith High School Replacement
New Construction
Conception
$85,000,000 est. value
Fayetteville, NC

M15 Fuquay-Varina Middle School
Renovation
Design
Fuquay-Varina, NC

H12 New High School
New Construction
Design
Less than $152,291,274 est. value
Apex, NC 27539

Boat Building Facility
New Construction
Bidding
Washington, NC 27889

2021 Security Vestibules
Renovation, Infrastructure
Bidding
Burlington, NC 27217

Tar Heel PK-8
Sub-Bidding
Tar Heel, NC

Modular School Building Upgrade Project
Renovation
Sub-Bidding
Kannapolis, NC 28083

New Middle School
New Construction
Post-Bid
$30,000,000 est. value
Jefferson, NC

West Millbrook Middle School Project
New Construction - 250,000 SF
Post-Bid
Raleigh, NC 27615

Additions to Swain County High School
Addition
Results
NC

Construction of Innovation Academy
New Construction
Results
Smithfield, NC 27577

New Northern High School Replacement
New Construction - 278,613 SF
Construction
$51,250,000 est. value
Durham, NC 27704

Thales Academy at Chatham Park
New Construction - 54,284 SF
Construction
$4,092,533 est. value
Pittsboro, NC 27312

Rosman Middle School
Renovation, Addition
Pending Verification
Rosman, NC 28772

Last Updated 11/11/2021 11:47 AM
Project Title

South Brunswick High School CTE Renovations

Physical Address View project details and contacts
City, State (County) NC   (Brunswick County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Description of Project: Remodeling of two interior classroom areas (Area A and Area B) within the existing high school. The scope of work includes architectural, interiors, plumbing, mechanical, and electrical modifications. Area A is a cad/drafting studio and project room that will undergo a refresh with selective demo and wall modifications, a new framed opening between the two spaces, casework/millwork additions, new flooring, new wall paint, and a vinyl applied wall graphic for the architectural and interiors work. Area A includes electrical modifications and additions to outlets, switches, and devices including the addition of ceiling mounted cord reels. The mechanical work in Area A includes the addition of a new exhaust duct for a 3D printer. Area B is an existing nursing classroom, math classroom, and computer room that will become two Allied Health classrooms. The scope of work includes similar modifications to Area A refresh with additional demolition of nonload bearing walls, added casework, new wall stud walls, new doors, concrete floor trenching for pipe replacements, and removing and adding medical curtain tracks for hospital simulation beds. Plumbing includes new sinks, in-floor piping, water heater and exhaust for new clothes dryer unit. Mechanical includes selective demolition and modification to the existing duct system and diffusers due to the combination of two spaces and relocating wall devices. Electrical work includes selective demo of outlets and devices, with new outlets provided throughout the space.

Details

Middle/Senior High School, Renovation.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Thermal Insulation.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Painting.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents