Similar Projects
Cornhusker Highway Entryway Corridor Improvements - 409457 - City of Lincoln
Infrastructure
Conception
$1,500,000 CJ est. value
Lincoln, NE 68504

Wilderness Hills Development Trail (YHR - 27th/40th) - I.F. Zone 6 - City of Lincoln
Infrastructure
Conception
$1,170,000 CJ est. value
Lincoln, NE 68516

East Viaduct Project - City Of Lexington
Infrastructure
Design
$9,600,000 CJ est. value
Lexington, NE 68850

Elk Creek Mining Project
New Construction, Infrastructure
Design
$1,000,000,000 CJ est. value
Tecumseh, NE 68450

WP-4 Reservoir and Associated Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Omaha, NE 68102

Bell Street Viaduct Rehabilitation Project
Term Contract
Bidding
Fremont, NE 68025

Structure Replacement
Renovation
Post-Bid
Juniata, NE

Pauline West Slab Bridge
New Construction, Infrastructure
Post-Bid
NE

Repair Bridge 16
Renovation, Demolition
Results
$25,000 to $100,000 est. value
Clay Center, NE 68933

Bridge
New Construction
Results
$80,000 to $299,000 est. value
Grand Island, NE

Streetcar Line - City of Omaha
Infrastructure
Pending Verification
$354,000,000 CJ est. value
Omaha, NE 68131

Bridges Repair County of Madison
Infrastructure, Renovation
Pending Verification
$500,000 CJ est. value
Norfolk, NE 68701

Fletcher Landmark Trail Phase 1 - Zone 2 - City of Lincoln
Infrastructure
Conception
$495,000 CJ est. value
Lincoln, NE 68521

Pavement M Avenue south of Highway 35 - C-22(280) - Dakota County
Infrastructure
Design
$2,000,000 CJ est. value
Hubbard, NE 68741

2022 CDBG Street Improvements
Infrastructure
Bidding
$580,000 CJ est. value
Dannebrog, NE 68831

Last Updated 12/27/2022 12:31 AM
Project Title

M-451 - 205 Elm Avenue Bridge Replacement

Physical Address View project details and contacts
City, State (County) Norfolk, NE 68701   (Madison County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance
Contracting Method Competitive Bids
Project Status Construction start expected June 2031
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

M-451 (205) Elm Avenue Bridge Replacement As of December 27, 2022, this project is currently in the FY 2023-2032 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2030. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2030. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents