Similar Projects
Security Center Complex
New Construction, Renovation
Conception
Spanish Fork, UT 84660

Snow Removal Building - City of Provo
New Construction, Infrastructure
Conception
Less than $5,627,276 est. value
Provo, UT 84601

UVU Engineering Building
New Construction - 184,000 SF
Design
$93,000,000 est. value
Orem, UT 84058

Spanish Fork Community Network Facility Construction
New Construction
Design
$8,000,000 est. value
Spanish Fork, UT 84660

RFP - Strategic Downtown Master Plan
Term Contract
Bidding
Saratoga Springs, UT 84045

DFCM Construction Pre Qualified Electrical USDC Campus Wide Fire Panel Upgrade/Replacement
Renovation
Sub-Bidding
$1,000,000 CJ est. value
American Fork, UT 84003

Spanish Fork Community Network Building Bid Package: BP-02 - All Remaining Trades BP-01-Metal Building
New Construction, Infrastructure
Sub-Bidding
$250,000 CJ est. value
Spanish Fork, UT 84660

Provo WATRR Center Phase 1 Project
Post-Bid
Provo, UT 84606

DFCM Construction - Pre-Qualification-General/Mechanical/Electrical/Roofing/Paving/Civil Contractors
Post-Bid

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Results
$3,000,000 to $15,000,000,000 est. value

D/B Western MATOC
Results
$1,000,000 to $70,000,000 est. value

New SUVSWD Environmental Recovery Facility
New Construction
Construction
Spanish Fork, UT 84660

Eagle Mountain Public Utilities Building
New Construction - 20,428 SF
Post-Bid
$5,400,000 est. value
Eagle Mountain, UT

Access Control Point Program Design Build II -- RFI(2)
Results

Defense Health Agency - Medical Facility Operations and Maintenance
Post-Bid
$2,500 to $90,000,000 est. value

Last Updated 08/11/2022 12:05 PM
Project Title

Department of Workforce Services (DWS) Front Back Stair Replacement

Physical Address View project details and contacts
City, State (County) Provo, UT 84604   (Utah County)
Category(s) Government/Public, Single Trades
Sub-Category(s) Finishes/Interior, Misc. Buildings
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $220,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Question Submission Close Date 8/15/2022 3:00 PM MDT The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the construction of the following project: Provo Workforce Services Front And Back Stair Replacement Department of Workforce Services Provo, Utah DFCM PROJECT #23236920 Project Description: Replacement of existing concrete stairs and stair railings at the front and back of the building. Additive Alternates: Additive Alternate 1: Replace select pads of concrete on ramp at the front of the building. This will be part of phase 2 of the project and will need to be completed over a weekend. See design plans for more information. Additive Alternate 2: Replace concrete sidewalk around the building. See design plans for more information. Access to entrances (including ADA access) needs to be maintained during Workforce Services business hours throughout the duration of construction.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents