Similar Projects
Lucky Star Wind Farm
New Construction, Infrastructure
Conception
$650,000,000 CJ est. value
Medicine Bow, WY 82329

Street Reconstruction - Pierce/Curtis Intersection - MCW-CP24-010 - City of Laramie
Infrastructure
Conception
$485,000 CJ est. value
Laramie, WY 82070

Two Rivers North Wind Farm
New Construction, Infrastructure
Design
$540,000,000 CJ est. value
Medicine Bow, WY 82329

Laramie Valley Chapel
Demolition, New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Laramie, WY 82070

Old Town Water System Rehabilitation Phase 2
Infrastructure
Bidding
$2,600,000 CJ est. value
Hanna, WY 82327

Drilling, Construction, Development, and Testing of One Exploration Well
Infrastructure
Bidding
$2,000,000 CJ est. value
Douglas, WY 82633

Multiple-Award Indefinite Delivery/Indefinite Quantity (IDIQ) Contract(s) for General Construction with Design/Build Capabilities
New Construction
Post-Bid
Less than $500,000,000 est. value

Multiple-Award Indefinite Delivery/Indefinite Quantity (IDIQ) Contract(s) for General Construction with Design/Build Capabilities
New Construction
Post-Bid
Less than $500,000,000 est. value

Reynolds Sanitary Sewer - Phase 2
Infrastructure
Results
$543,826 CJ est. value
Laramie, WY 82072

RFP D/B - North Big Horn County Airport U68-Install NAVAID - Runway 27 REILs
Infrastructure
Results
$75,110 CJ est. value
Lovell, WY 82431

U-Haul of Gillette
New Construction, Infrastructure - 38,264 SF
Pending Verification
$4,000,000 CJ est. value
Gillette, WY 82718

Rail Tie Wind Project
New Construction, Infrastructure
Conception
$500,000,000 CJ est. value
Tie Siding, WY 82084

City Pool - City of Gillette
New Construction, Infrastructure
Design
$800,000 CJ est. value
Gillette, WY 82716

Fir Avenue Sewer Improvements
Infrastructure
Bidding
$500,000 CJ est. value
Gillette, WY 82716

Rapid Response Single Award Task Order Contract (SATOC)
New Construction
Post-Bid
Less than $95,000,000 est. value

Last Updated 12/08/2022 10:33 PM
Project Title

FY23 Public Works Facility Garage Addition

Physical Address View project details and contacts
City, State (County) Torrington, WY 82240   (Goshen County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected January 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $420,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 21, 2022, bids received were rejected as they were over the budget. Project will rebid but no definite date yet. City of Torrington, Wyoming will receive sealed bids for the furnishing of all labor, materials, tools, appliances, transportation, and services necessary for: a design-build project for the construction of a 35 x 130 steel addition to the existing Public Works Facility. Addition is a 7 bay garage that is to be an insulated, heated and lighted. All bids must be furnished on forms supplied by the City of Torrington. Sealed envelopes containing bids shall be clearly marked with the project title and shall show the name and address of the Bidder. Bids which are not prepared and filed in accordance with the Instructions to Bidders may be rejected. Bids may not be withdrawn after the time fixed for opening. The City reserves the right to reject any and all bids and the right to waive irregularities in bids received. Preference is hereby given to materials, supplies, equipment, machinery and provisions produced, manufactured, supplied or grown in Wyoming, quality being equal to articles offered by competitors outside the State, as provided in W. S. 16-6-101 through 16-6-119.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents