Similar Projects
Home2Suites and Hilton Garden Inn / Edwardsville
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Edwardsville, IL 62025

Canal Road Pump Stations No. 2 & No. 3 At Wood River Levee District
Renovation
Design
$1,000,000 to $5,000,000 est. value
Roxana, IL

Melvin Price Locks and Dam Lift Gate Install and Machinery Replacement Project
Infrastructure
Bidding
$10,000,000 CJ est. value
East Alton, IL 62024

Swimming Pool Filtration System Improvements
Renovation, Infrastructure
Bidding
$2,000,000 CJ est. value
Trenton, IL 62293

New Storage Building
New Construction, Infrastructure
Sub-Bidding
$300,000 CJ est. value
O Fallon, IL 62269

Lakeside Villas
New Construction, Infrastructure - 24,794 SF
Sub-Bidding
$9,000,000 CJ est. value
Carlyle, IL 62231

Weatherization 100 Year Floodplain Project
New Construction
Post-Bid
Granite City, Madison, IL 62040

Re-Development of the Old Lincoln School Site
Infrastructure
Post-Bid
Wood River, IL 62095

Building Demolition and Site Work - AMP 3
Demolition
Results
Centreville, IL

Riverfront Development Phase 8
Results
$2,727,884 est. value
Alton, IL 62002

Kimundy Pump Station - Contract B
New Construction - 23,500 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Sandoval, IL 62882

2021 Water Main Extensions - Contract A
Alteration
Construction
Sandoval, IL 62882

Brandywine Garden Villas
New Construction, Infrastructure - 62,622 SF
Pending Verification
$75,000,000 CJ est. value
O Fallon, IL 62269

2022 Bond - Highland Primary School and Middle School Addition - Highland CUSD #5
Addition, Demolition, New Construction, Infrastructure
Pending Verification
$40,000,000 CJ est. value
Highland, IL 62249

Carlyle Lake Main Dam Painting
Renovation, Infrastructure
Bidding
$5,000,000 CJ est. value
Carlyle, IL 62231

Last Updated 08/29/2022 11:31 PM
Project Title

Zone 6 - Statewide Leaking Well Plugging and Restoration Work

Physical Address View project details and contacts
City, State (County) Germantown, IL 62245   (Clinton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $18,468 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of August 29, 2022, this project has been awarded to LR Russell oil Producers $17,720.26 and Bangert Well Service,Inc $18,468.00. The Illinois Department of Natural Resources requires the services of suitably qualified Vendors to properly perform plugging and restoration work on multiple sites in Bond, Clinton, Fayette, Madison, Marion and St. Clair Counties, Illinois. See Notice of Electronic Submissions Only attachment. Is this a Small Business Set Aside Procurement: No Is there a BEP/VBP Participation Goal : No Rotary Rig - TRANSPORTATION: Rig mileage will be paid for one round trip only. The mileage cost shall be for the shortest distance along U. S. or State highways from the CONTRACTOR'S home office to the emergency project site. Non-Rotary Rig - TRANSPORTATION: Rig mileage will be paid for one round trip only. The mileage cost shall be for the shortest distance along U. S. or State highways from the CONTRACTOR'S home office to the emergency project site. Pickup Truck - TRANSPORTATION: Paid for on an as needed basis. The mileage cost shall be for the shortest distance along U. S. or State highways from the CONTRACTOR'S home office to the emergency project site. Utility Truck - TRANSPORTATION: Paid for on an as needed basis. The mileage cost shall be for the shortest distance along U. S. or State highways from the CONTRACTOR'S home office to the emergency project site. Dump Truck - TRANSPORTATION: Paid for on an as needed basis. The mileage cost shall be for the shortest distance along U. S. or State highways from the CONTRACTOR'S home office to the emergency project site.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents