Similar Projects
Last Updated | 05/15/2023 05:43 PM |
Project Title | Demolition of Four (4) Residential Structures |
Physical Address | View project details and contacts |
City, State (County) | Johnstown, PA 15901 (Cambria County) |
Category(s) | Single Trades |
Sub-Category(s) | Environmental |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $24,600 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | CLARIFICATION DEADLINE 5/5/2023 4:00 PM A certified check or bank draft, payable to the Johnstown Redevelopment Authority, or bid bond in the amount of 10% of the total bid amount shall be submitted with each bid. JRA reserves the right to waive informalities and to reject any or all bids. JRA is an equal opportunity employer. Disadvantaged Business Enterprises are encouraged to submit. 472 Chestnut St., Conemaugh, PA 15909 East Conemaugh Borough Multi-story residential 22-011.-205.001 146 2ndSt., Conemaugh, PA 15909 East Conemaugh Borough Corner of Basswood St and B Aly Multi-story residential 22 002.-112.000 830 Bedford St., Johnstown, PA 15902 Dale Borough Multi-story residential FRONT HOUSE ONLY 19-007.-128.000 820 BEDFORD STREET, JOHNSTOWN, PA 15902 - DALE BOROUGH TAX MAP PARCEL # 19-007.-131.001 SCOPE The contractor shall furnish all work, services, materials and related items necessary to complete the work specified and in the area indicated on the attached site plan. The work includes, but is not limited to, the following: 1. Protecting all adjacent properties and natural features of areas to remain undamaged. 2. Demolishing and removing all posts and settings, buildings, sheds, fences, structures, porches, walls, furnaces and fuel tanks on or underneath the ground. 3. Demolish and remove paved surfaces (except street sidewalks). 4. Disconnecting and sealing utilities. 5. Removing all rubbish, junk and trash from the site. 6. Providing all necessary licenses, permits and pay fees. 7. Preserving all operating utilities serving other properties and related appurtenances on site. 8. Providing adequate protection to persons and property. 9. Providing dust control. 10. Clearing and filling all wells, cisterns and similar underground structures. 11. Breaking up basement floors. 12. Demolishing and removing all above-ground masonry. 13. Backfill basements and other excavations. 14. Leaving site free of all demolition refuse, trash and junk. 15. Restoring to original grades and conditions all properties damages by any activity related to the work and taking adequate precautions to avoid settlements or cave-ins of properties higher than site; or other damage to properties lower than site. 16. After back-filling has been completed and approved by borough officials, apply 3" to 4" topsoil. The Johnstown Redevelopment Authority is not requiring any seeding or planting to be done at demolition site. The site does, however, need to be graded and left in a presentable manner. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |