Similar Projects
Chiller PM Services
Term Contract
Bidding
Oklahoma City, OK 73104

HVAC Unit
Alteration
Bidding
Oklahoma City, OK 73104

HVAC Systems Water Treatment Program
Alteration
Post-Bid
Oklahoma City, OK

Annex Building HVAC Replacement
Alteration
Post-Bid
Oklahoma City, OK 73117

Z1da--635-22-148 Correct Research Ventilation System (Va-21-00026378)
Results
Oklahoma City, OK 73104

HVAC Maintenance and Repair Project
Results
$200,000 est. value
Oklahoma City, OK

Furnish and Install Air Handler Control Valves
Alteration
Bidding
Oklahoma City, OK

Central Middle School - 2021 HVAC Renovation
Alteration
Post-Bid
Edmond, OK 73034

J041--Chiller #2, #3, & #4, Repair Oklahoma City VA Health Care System Oklahoma City, OK 73104
Term Contract
Results
Oklahoma City, OK 73104

Will Rogers Elementary HVAC Replacement
Alteration
Post-Bid
Oklahoma City, OK 73142

Chiller Panel Removal and Replacement
Alteration
Results
$116,000 est. value
Oklahoma City, OK 73102

S21-041 H53 Systems Furniture
Term Contract
Post-Bid
Oklahoma City, OK 73145

On-Call Building Automation and Controls HVAC - Oklahoma History Center
Alteration
Results
$8,913 est. value
Oklahoma City, OK

PAA Boiler
Term Contract
Post-Bid
Oklahoma City, OK 73145

Chiller Maintenance and On-Call Services
Alteration
Results
$15,180 est. value
OK 73105

Reported 12/03/2021 12:00 AM
Project Title

Purchase and Install Air Handling Unit

Physical Address View project details and contacts
City, State (County) Oklahoma City, OK 73117   (Oklahoma County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: • Belimo energy Valve part number EV500SU-495+GRX24-EV (97,Z,1,14,1,2,AHU2) installed per mfgr instructions on chilled water return lines. • Temperature and pressure gauges with ball valves in chilled water supply and return lines. • Auto vents and ball valves on high points of chilled water piping as well as manual drains at low points with ball valves. • Belimo steam control valves shall be installed by contractor1/3, 2/3 valves with a 15 cv on 1/3 valve and a 31 cv on 2/3 valve. • 2 new float and thermostatic traps will need to be installed on each stem coil sized appropriately for the steam coils. • A new steam shutoff valve and strainer will need to be provided before the control valve as well as valves entering each coil. Air vents and vacuum breakers for each coil and a bypass for the steam traps will also need to be provided. • A ball valve, siphon tube, and pressure gauge will need to be install after the steam control valve. • Existing heat recovery coil has glycol in the piping, the glycol will need to be recovered out of the system and reused in the new AHU. • The heat recovery loop will need ball valves and auto vents installed in the high point of the piping, and a manual drain at any low points for maintenance. • Temperature wells and gauges will need to be installed in the incoming and outgoing piping of the AHU. • Any auto vents in heat recovery loop will need to be piped to an overflow tank. • Contractor will need to provide their own electrician for high voltage connections of new AHU, they may need to be present during the mandatory site visit.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents