Similar Projects
Church Street Stormwater Improvements CDBG
Bidding
Buford, GA 30518

209 King Arthur Drive Storm System Improvement
Post-Bid
Lawrenceville, GA 30046

Hanarry Estates Pond Outlet Control Structure Replacement
Post-Bid
Lawrenceville, GA

Watershed Improvements on an Annual Contract
Term Contract
Results
$1,897,658 est. value
Lawrenceville, GA

Garner Creek Watershed Improvement Project
Results
Lilburn, GA

363 Downing Street Storm Drain Repair Project
Post-Bid
Lawrenceville, GA

240 Longview Culvert Replacement
Results
$69,650 est. value
Norcross, GA

105 Grayland Place Storm Drain Improvement Project
Post-Bid
Lawrenceville, GA

Closed-Circuit Television (CCTV) Storm Drain Pipe Inspection on an Annual Contract
Term Contract
Results
Less than $67,500 est. value
Lawrenceville, GA

1021 Stone Mill Way Storm Drain Outlet Protection
Post-Bid
Lawrenceville, GA 30046

Gwinnett County Facilities Stormpond Maintenance and Repair Project
Results
Lawrenceville, GA 30046

650 Hurricane Shoals Road Storm Drain Replacement
Post-Bid
Lawrenceville, GA

Trenchless Stormwater Pipe Rehabilitation on an Annual Contract
Term Contract
Results
Less than $5,140,939 est. value
Lawrenceville, GA 30046

1140 Grayland Hill Trail Storm Drain Replacement
Post-Bid
Lawrenceville, GA

Stormwater Infrastructure Replacement Projects on an Annual Contract
Term Contract
Results
Less than $5,000,000 est. value
Lawrenceville, GA

Reported 07/18/2019 12:00 AM
Project Title

181 Hanarry Drive and Blake Court Storm Drain System Replacement Project

Physical Address View project details and contacts
City, State (County) Lawrenceville, GA   (Gwinnett County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Demolition and removal of existing 18” - 54” CMP storm drain pipe system. Replace & Install new RCP & HDPE 18”- 54”Pipes and tie-in to existing structures Install complete 24" curb & gutter. Installation of sod/mulch on areas disturbed by construction activities including erosion control. Re-grout all exist. structures & site clearing. The equipment and materials to be furnished by the Contractor will be installed at the locations shown on the Drawings and as described in the respective section of these specifications. Installation of erosion control BMP’s
Details
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents