Similar Projects
Highway Reconstruction and Bridge Replacements - Camden - Region 2
Demolition, New Construction, Infrastructure
Post-Bid
$18,892,871 CJ est. value
Camden, ME 04843

2023 Forest Grove Cemetery Mowing Services
Term Contract
Post-Bid
Lebanon, ME 04027

Entryway Steps Replacement Project
Alteration
Results
Houlton, ME 04730

2023 Roadway Paving
Infrastructure
Results
$115,508 CJ est. value
Bowdoinham, ME 04008

2023 Prospect Hill Cemetery Mowing Services
Term Contract
Post-Bid
Lebanon, ME 04027

Large Culvert Replacement - Warren, Region 2
Infrastructure
Results
$775,126 CJ est. value
Warren, ME 04864

Headstone Installation
Alteration
Post-Bid
Sanford, ME 04083

2023 Roadway Improvements - Paris Maine
Infrastructure
Results
$747,659 CJ est. value
South Paris, ME 04281

Concrete Pads at the Swanville Transfer Station
Alteration
Post-Bid
$50,000 est. value
Monroe, ME 04951

Construction of Two (2) Dual Electric Vehicle (EV) Charging Stations
New Construction, Infrastructure
Results
$90,480 CJ est. value
Brewer, ME 04412

New Patios at Woodman Heights
Alteration
Post-Bid
$175,000 to $250,000 est. value
Waterville, ME

Crack Seal, Crack Repair and Mark Airport Pavements
Infrastructure
Results
$73,500 CJ est. value
Kingfield, ME 04947

2022-2023 Crack Sealing
Infrastructure
Post-Bid
$40,000 CJ est. value
Buxton, ME 04093

Crack Seal / Repair and Marking Runway 14-32
Infrastructure
Results
$79,165 CJ est. value
Greenville, ME 04441

Seal East Ramp and Mark East Ramp
Infrastructure
Post-Bid
$4,000,000 CJ est. value
Sanford, ME 04073

Last Updated 05/04/2023 04:08 PM
Project Title

2023 Town Properties Mowing Services

Physical Address View project details and contacts
City, State (County) Lebanon, ME 04027   (York County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Spring cleanup shall take place before the first mowing, typically during the third week in April. Debris is defined as leaves, grass clippings, twigs, branches, trash, any gravel, rock, payment, sod, loam, etc. All debris must be removed from the site and properly disposed of by the contractor. The Fall cleanup shall take place after November 1st . Debris is defined as leaves, grass clippings, twigs, branches, trash, any gravel, rock, pavement, sod, loam, etc. Perform minor brush cuttings to include overgrown weeds. Report fallen trees and major limbs to the Town. All debris must be removed from the site and properly disposed of by the contractor

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents