Similar Projects
Sunnyvale Park Improvements
Bidding
$300,000 to $400,000 est. value
Millcreek, UT

Lindsey Gardens Concession and Pedestrian Access 426 M Street
New Construction
Bidding
$1 to $415,000 est. value
Salt Lake City, UT 84103

Pickleball Court Construction Project
Post-Bid
Sandy, UT 84070

Columbus Park Improvements
Post-Bid
Salt Lake City, UT 84115

Grand Vistas Park Site Improvements Project
Results
Less than $1,000,000 est. value
West Valley City, UT 84128

Ball Field Preparation
Term Contract
Results
Bluffdale, UT 84065

Skyline High School Baseball Field
Construction
East Millcreek, UT 84109

Taylorsville Mixed Use
New Construction - 40,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Taylorsville, UT

Fisher Mansion Carriage House River Recreation and Community Engagement Hub
Bidding
$1 to $1,359,762 est. value
Salt Lake City, UT 84104

K9 Memorial Dog Park Project
Post-Bid
Herriman, UT 84096

Herriman High Track Resurface
Results
$400,000 to $500,000 est. value
Herriman, UT 84096

Construction Services for Pioneer Crossing Park – Phase I
New Construction
Bidding
Salt Lake City, UT

Big Bend Park Project
Post-Bid
Herriman, UT 84096

Construction of the Riverton City Dog Park
Results
Less than $300,000 est. value
Riverton, UT 84065

SLCO Pioneering Crossing Park Contractor Services Stage 1
Renovation
Bidding
West Valley City, UT

Reported 08/28/2020 12:00 AM
Project Title

Playgrounds

Physical Address View project details and contacts
City, State (County) Riverton, UT   (Salt Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $60,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Recreation would like to enlarge the playground pit area and put a concrete border around it. There is a basketball court on part of the south side of the playground pit and that will be the concrete border there and all the remaining border will need to be poured; however, a transition will need to be made between the playground pit border and the basketball court because there is a difference in elevations, see attached photo. The playground pit currently has a jog in it, (shaped similar to Utah), see the attached aerial photo. Contractor is to remove sod and soil in that area making the playground pit square, 70' x 50', remove the sod and soil to a depth of 14". Concrete border is to be 14" deep x 6" wide, no reinforcing, work must include removing the existing border and site prep. May include pumping the concrete, to eliminate landscape damage.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents