Similar Projects
K-Life Of Hot Springs
New Construction, Infrastructure - 3,000 SF
Design
$981,000 CJ est. value
Hot Springs, AR 71913

Park Avenue Widening - Fox Pass Cutoff to Highway 5 and 7 - Arkansas Department of Transportation
Infrastructure
Design
$18,000,000 CJ est. value
Hot Springs National Park, AR 71901

Spring Street Sewer Improvements
Infrastructure
Bidding
$300,000 CJ est. value
Hot Springs National Park, AR 71901

ASMSA Elevator Replacement
Renovation, Alteration
Post-Bid
Hot Springs, AR 71901

Property Clearing and Grubbing
Infrastructure
Post-Bid
Hot Springs, AR 71901

Water Sculpture / Fountain For Jean W. Wallace Trailhead
Infrastructure
Results
$400,000 CJ est. value
Hot Springs National Park, AR 71901

Renovation of an Existing Staff Suite
Renovation
Results
$370,000 CJ est. value
Hot Springs National Park, AR 71901

Big Red Convenience Store / Hot Springs
New Construction, Infrastructure - 4,100 SF
Pending Verification
$1,000,000 CJ est. value
Hot Springs, AR 71913

Adcock Road Office Development
Demolition, New Construction, Infrastructure - 25,402 SF
Pending Verification
$5,000,000 CJ est. value
Hot Springs, AR 71913

Repairs at Buckstaff Bathhouse
Infrastructure, Renovation
Design
$1,000,000 CJ est. value
Hot Springs National Park, AR 71901

Stabilization of Ault Loop
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Hot Springs National Park, AR 71901

Garland County Library Garden
New Construction, Infrastructure
Results
$475,100 CJ est. value
Hot Springs National Park, AR 71901

Vista Point Duplexes
New Construction, Infrastructure - 28,000 SF
Pending Verification
$4,149,200 CJ est. value
Hot Springs, AR 71913

Curb, Gutter, Sidewalks, Rain Gardens, Etc. on Chelsea Street, Creek Street and Whittington Avenue (CDBG)
Infrastructure
Post-Bid
$400,000 CJ est. value
Hot Springs National Park, AR 71901

Albert Pike-Airport Project - Arkansas Department of Transportation
Infrastructure
Pending Verification
$100,000,000 CJ est. value
Hot Springs, AR 71913

Last Updated 11/18/2022 02:40 PM
Project Title

Arkansas School for Mathematics, Sciences and the Arts - New Administration Building

Physical Address View project details and contacts
City, State (County) Hot Springs National Park, AR 71901   (Garland County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $4,383,128 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

**As of November 18, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** You are invited to bid on a General Contract for the Construction of the New Administration Building located at 200 Whittington Avenue, Hot Springs, Arkansas. A Bid Bond executed by the bidder and a surety company authorized to transact business in Arkansas payable to the Owner in an amount not less than 5% of the bid submitted must accompany each bid as a guarantee that, if awarded the contract, the bidder will promptly enter into a contract and execute such bonds as may be required. A Performance and Payment bond will also be furnished by the successful bidder within ten (10) days after receipt of the intent to award notice. Failure to furnish the required bonds may cause forfeiture of bid guarantee to the Owner as liquidated damages. Bidders shall conform to the requirements of the Arkansas licensing laws and regulations for contractors and shall be licensed before bid is submitted. Pursuant to Ark. Code Ann. 22-9-203, the Owner encourages all small, minority and women business enterprise to submit bids for capital improvements. Encouragement is also made to all general contractors that in the event the subcontract portions of their work, consideration is given to the identified groups. Bids will be retained by ASMSA for a period of 60 days after the bid opening. No bids can be withdrawn during this timeframe. The Owner reserves the right to reject any or all bids and to waive any formalities. The estimated design and construction timeline is 24 months, and the estimated project cost anticipates construction will begin in late 2022 with a target completion date of January 2024

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents