Similar Projects
Ravine and Streambank Site Restoration
Conception
$43,900 est. value
Beach Park, IL 60085

2020 Drainage Program Survey, Design and Permitting Services
Conception
Barrington, IL 60010

PIP-II Site Work (Excavation)
Post-Bid
Batavia, IL

748842: DWM Job Order Contract Civil - Site Work Disciplines
Term Contract
Post-Bid
Chicago, IL

Site Improvements
Renovation
Results
$146,000 est. value
Des Plaines, IL 60016

Community Center Parking Lot Phase 2 & Maintenance Yard
Renovation
Results
Mundelein, IL 60060

Menards Warehouse Site Work
Renovation - 639,610 SF
Construction
Batavia, IL 60510

Renewable Energy & Urban Farming Campus
New Construction - 13,000 SF
Construction
$36,000,000 est. value
Chicago, IL 60661

Tuscany Station Mixed Use
New Construction
Pending Verification
Oswego, IL 60543

Fox College Parking Lot & Detention Addition
Conception
Tinley Park, IL

Re-Roof & Re-Pave
Renovation - 332,119 SF
Post-Bid
Freeport, IL 61032

Removal and Replacement of an Existing 32-Foot Long 18" X 24" Culvert With A Proposed 48-Foot Long 36" X 72" Cast in Place Culvert (Proposed SN 016-2272)
Results
IL

Menard Sitework
Renovation
Post-Bid
Sterling, IL 61081

Slope Stabilization Project On Il Rte 83 From North Of Glenwood Dyer Road To South Of Glenwood Lansing Road That Includes Guardrail Replacement
Results
IL

JMTC-RI Concrete Trench Fill-In
Post-Bid
Rock Island, IL 61299

Last Updated 10/15/2020 05:16 PM
Project Title

Regional Detention Improvements

Physical Address View project details and contacts
City, State (County) Cherry Valley, IL 61016   (Winnebago County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $63,527
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The improvements include Excavations, Clearing and Grading and Erosion Control Measures.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents