Similar Projects
Coastal Storm Risk Management Ocean Isle Beach, NC
Design
$10,000,000 est. value
Kure Beach, Ocean Isle Beach, Wrightsville Beach, NC

Disaster Response Emergency/On-Call Construction Services
Term Contract
Post-Bid
NC

Emergency Watershed Protection Project Round 2
Infrastructure
Post-Bid
Bolivia, NC 28422

Bladen Bluffs Regional Surface Water Treatment
Results
Leland, NC 28451

USDA Emergency Watershed Protection (EWP)
Results
Less than $251,160 est. value
Leland, NC

South Brunswick High School Baseball Field Regarding
Renovation, Infrastructure
Post-Bid
Boiling Spring Lakes, NC 28461

Emergency Watershed Protection Project Round 3
Results
Bolivia, NC

Railroad Culvert at Cardinal Road and Military Ocean Terminal Sunny Point Railroad
Infrastructure
Post-Bid
$400,000 est. value
Boiling Spring Lakes, NC 28461

Headwall - Twin Run
Results
Boiling Spring Lakes, NC 28461

Emergency Watershed Protection Project Round 1
Infrastructure
Post-Bid
Bolivia, Shallotte, NC 28470

Aluminum Headwall - Culvert
Results
Leland, NC 28451

Pedricktown Disposal Area Complex
Term Contract
Post-Bid
$5,000,000 to $10,000,000 est. value

Headwall - Culvert
Results
Leland, NC 28451

Polypropylene Pipe
Results

Boones Neck Pipe Replacement
Alteration
Results
Supply, NC 28462

Last Updated 08/20/2021 10:34 AM
Project Title

Eagle Island, Cell 2, Erosion Protection

Physical Address View project details and contacts
City, State (County) NC   (Brunswick County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes work at Cell 2 and 3 of the Government owned Eagle Island Confined Disposal Facility (CDF) also referred to as the Dredged Material Disposal Area. For Cell 2, this work consists of constructing approximately 1,000 linear feet of erosion protection along the toe berm located on the Cape Fear River (east) side and includes general grading of the existing dike and toe berm, placement of bedding and riprap materials, and sediment and erosion control. For Cell 3, the work consists of constructing exterior toe berms along the outside toe on the Brunswick River (west) and north sides and includes removal of trees, clearing and grubbing, placement of fill material, and sediment and erosion control. The interior of Cell 2, location of dredged material, will be available as a source of borrow material to construct the toe berms. Control and diversion of water along with pumping and dewatering will be required.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents