Similar Projects
Canyon Wren Townhomes - General Contractor Bids Needed
New Construction, Infrastructure - 30,000 SF
Design
$7,000,000 CJ est. value
Moab, UT 84532

UT NP MULTI PMS(2) & NV NP GRBA PMS(1), Pavement Preservation Southern Utah and Pavement Preservation Great Basin
Infrastructure
Design
$10,000,000 CJ est. value
Moab, UT 84532

RFQ Contractor - La Sal Mountain Loop Road
Infrastructure
Post-Bid
$30,000,000 CJ est. value
Moab, UT 84532

RFQ Contractor - La Sal Mountain Loop Road
Infrastructure
Post-Bid
$30,000,000 CJ est. value
Moab, UT 84532

US-191 - SR-279 to Seven Mile Wash
Infrastructure
Results
$6,000,000 to $10,000,000 est. value
Moab, UT 84532

Sand Flats Gravel Parking Lot
Infrastructure
Results
Moab, UT 84532

The Atlas Apartments
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Moab, UT 84532

The Atlas Apartments
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Moab, UT 84532

Asphalt Paving - Arches National Park
Infrastructure
Post-Bid
$250,000 CJ est. value
Moab, UT 84532

US-191; La Sal Junction to Moab
Infrastructure
Results
$1,500,000 to $3,000,000 est. value

HooDoo Hotel Phase II
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Moab, UT 84532

The Lost Springs Apartments
New Construction, Infrastructure - 72,824 SF
Post-Bid
$30,000,000 CJ est. value
Moab, UT 84532

US-191; Passing Lane, MP 153.0 to MP 157.0
Infrastructure
Results
$3,000,000 to $4,000,000 est. value
UT

300 East Multi-Residential Development
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Moab, UT 84532

Pack Creek Fire Emergency Watershed Protection
Infrastructure
Post-Bid
$450,000 CJ est. value
Castle Valley, UT 84532

Last Updated 05/05/2023 12:06 PM
Project Title

Western Spirit

Physical Address View project details and contacts
City, State (County) Moab, UT 84532   (Grand County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Office, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project was seeking approvals from Moab Planning in May 2022. As of May 5, 2023, it is unknown what approvals have been obtained with planning. No building permits have been submitted for review. Construction could begin in fall 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

6,000 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents