Similar Projects
The Apex Business Center
New Construction, Renovation - 570,000 SF
Design
$105,000,000 est. value
Omaha, NE

Compressed Natural Gas (CNG) Fueling Station
New Construction, Infrastructure
Design
$4,481,919 CJ est. value
Lincoln, NE 68508

Railroad Overpass Bridge Repair in Harlan County
Infrastructure
Bidding
$500,000 CJ est. value
Republican City, NE 68971

2022 Part 2 Improvements - 56th Street & Avenue N Turning Lanes
Infrastructure
Bidding
$560,000 CJ est. value
Kearney, NE 68847

District 2 On-Call Util Location Service
Term Contract, Infrastructure
Post-Bid
$5,000,000 est. value

District 2 On-Call Util Location Service
Term Contract, Infrastructure
Post-Bid
$5,000,000 est. value

US-6/Harrison ST
Infrastructure
Results
$5,000,000 est. value
NE

2021 Cemetery North Addition - Phase I
Addition, Infrastructure
Results
Kearney, NE

Stadium Team Meeting Room Building - Papillion LaVista Public Schools
New Construction, Infrastructure - 4,950 SF
Construction
$940,500 CJ est. value
Papillion, NE 68046

Costco Wholesale Off-Site Parking Lot / Omaha
Infrastructure - 153,409 SF
Construction
$200,000 CJ est. value
Omaha, NE 68154

New Elementary School - Elm Creek Public Schools
Addition, Demolition, New Construction, Infrastructure
Pending Verification
$11,980,000 CJ est. value
Elm Creek, NE 68836

Nebraska Crossing
Addition, New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Gretna, NE 68028

WP-4 Reservoir and Associated Improvements
Infrastructure
Design
$200,000 CJ est. value
Omaha, NE 68102

Veterans Housing Tri-plex Units
New Construction, Infrastructure - 4,442 SF
Bidding
$2,500,000 CJ est. value
Winnebago, NE 68071

District 5 On-Call Util Location Service
Term Contract, Infrastructure
Post-Bid
$5,000,000 est. value

Last Updated 11/17/2022 03:37 PM
Project Title

Security Bank Branch Office

Physical Address View project details and contacts
City, State (County) Hartington, NE 68739   (Cedar County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Bank, Site Development
Contracting Method Construction Management - CM at Risk, Bids by Invitation
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $15,000,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following: New Credit Union facility, approximately 6,1000 sf Project is similar to the last time but you will need to look at the new plans. We would appreciate scope letters at least 24 hours minimum or more before the bid and your bid the day of the bid November 17, 2022. Let us know if you are bidding with a reply. If you have any questions, please call the office. Single story structure. Construction consists of slab on grade, steel frame structure with metal stud infill. A section of the building is storm hardened with reinforced CMU walls and a composite steel deck and concrete lid. The entire set of construction documents should be reviewed to understand the full scope of the project requirements. It remains the responsibility of the bidder that their bid arrives not later than the given bid deadline. Scope letters from bidders should also be submitted by 10:00 a.m, of the same day. Contact RaDec Construction Co., if you have any questions. The Construction Manager for this project is RaDec Construction Co., 308 North Broadway Avenue, P.O. Box 667, Hartington, NE 68739. If shipping of Bid Documents is required, there is a non-refundable fee in the amount of $65.00 payable to A&D Technical Supply Co., Inc. If shipping of CD is required, there is a flat fee in the amount of $9.00 payable to A&D Technical Supply Co., Inc. Bid Documents MUST be returned, in good condition, within 30 calendar days of Bid Opening to obtain a deposit refund.

Details

1 Story Above Grade, 5,852 SF.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation.
Division 08 - Openings, Metal Doors and Frames, Special Function Doors, Entrances and Storefronts, Special Function Hardware, Special Function Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Partitions, Emergency Access and Information Cabinets, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Security Mirrors and Domes.
Division 11 - Equipment, Security, Detention, and Banking Equipment, Vault Equipment, Safe Deposit Boxes, Safes, Vault Ventilators, Teller and Service Equipment.
Division 12 - Furnishings, Art, Window Treatments, Specialty Casework, Bank Casework, Furniture, Office Furniture.
Division 13 - Special Construction, Vaults, Security Vaults.
Division 14 - Conveying Equipment, Pneumatic Tube Systems.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs, Gutters, Sidewalks, and Driveways, Curbs and Gutters, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents