Similar Projects
E Avenue North East from 19th Street to 20th Street
Conception
$1,650,000 est. value
Cedar Rapids, IA 52402

15th Avenue South West from 4th Street to C Street
Conception
$1,707,000 est. value
Cedar Rapids, IA 52404

2021 Cowles Drive Reconstruction - Phase 2 and 3
Infrastructure
Bidding
$12,500,000 est. value
Des Moines, IA 50321

Water System Improvements
Term Contract
Bidding
Storm Lake, IA 50588

Commerce Crossings Development Public Improvements
Infrastructure
Post-Bid
Bondurant, IA

South Grand Prairie Parkway - Stagecoach Drive to Grand Avenue
Infrastructure
Post-Bid
WDM, IA 50266

Marshall Street Reconstruction 2021 Washington Street to Jefferson Street
Results
$510,000 est. value
Prairie City, IA 50228

8th Street SE Water and Sewer Extensions
Results
$1,463,902 est. value
Altoona, IA

Sunset Dr/IA Highway 28 and North Avenue Intersection Improvements
Infrastructure
Bidding
$2,088,769 est. value
Norwalk, IA

State Street (Highway 44) Water Main Replacement - Guthrie Center Municipal Utilities
Infrastructure
Post-Bid
$950,000 est. value
Guthrie Center, IA

2021-22 Water Main Improvements
Results
$4,473,470 est. value
Bedford, IA

2021 and 2022 Seal Coat Street Pavement Improvements and Water System Improvements Program
Infrastructure
Bidding
$963,952 est. value
Ames, IA 50010

Dubuque Street Phase 1
Infrastructure
Post-Bid
North Liberty, IA

Prairie City Water System Improvements - Phase 1
Infrastructure
Results
$1,080,000 est. value
Prairie City, IA

Ag Park Sanitary Sewer Air Release Valve Replacement Project
Infrastructure
Bidding
Des Moines, IA 50309

Last Updated 12/28/2021 11:59 AM
Project Title

Highway 1 Water Main Replacement

Physical Address View project details and contacts
City, State (County) Iowa City, IA 52246   (Johnson County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $460,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will involve the following: approximately 1,600 feet of 12” PVC water main installed by directional drill method on the north side of Highway 1 between Westport Plaza (Walmart Entrance) and Hawk Ridge Drive. In addition, the construction activities will include the associated fittings, valves, hydrants, traffic control, shared use path removal and restoration, and seeding.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents