Similar Projects
Fire Administration Stand-By Power Redundancy for Critical Facility - FA2402 - City of Pearland
Renovation, Alteration
Conception
$620,000 est. value
Pearland, TX 77584

Rehabilitation of the Existing Electrical Generator and Automatic Transfer Switch
Renovation
Sub-Bidding
$100,000 CJ est. value
Houston, TX 77082

Replace Electrical (Phase I) - Memorial Unit
Renovation
Sub-Bidding
$2,385,000 CJ est. value
Rosharon, TX 77583

Replace Switchgear
Renovation
Post-Bid
$700,000 CJ est. value
College Station, TX 77840

Communication Infrastructure Upgrade
Infrastructure
Post-Bid
$500,000 CJ est. value
Fort Hood, TX 76544

West End Water Supply Corporation Emergency Backup Generator at Willow Springs Water Plant
Alteration
Results
$258,000 est. value
TX

Campus Data Cabling Services
Alteration
Results
$20,000 est. value
Brownsville, TX 78520

Audio Visual - System Wide Refresh
Renovation
Sub-Bidding
$150,000 CJ est. value
Houston, TX 77002

PA System, Clock and Bell Repair and Upgrade
Term Contract
Post-Bid
Plano, TX 75074

Acoustic Enhancement System
Alteration
Results
McKinney, TX

Traffic Signal at North Bridgeland Lake Pkwy & Peek Rd
Infrastructure
Sub-Bidding
$400,000 CJ est. value
Houston, TX 77002

Installation of Emergency Power
Renovation
Post-Bid
$1,400,000 CJ est. value
Angleton, TX 77515

Forensic Science Center UPS Replacement
Alteration
Results
San Antonio, TX 78229

Lighting Upgrades at Various Facilities
Renovation
Sub-Bidding
$600,000 CJ est. value
San Antonio, TX 78205

Installation of Emergency Power
Alteration
Post-Bid
$400,000 est. value
Palestine, TX 75803

Last Updated 10/07/2023 01:02 AM
Project Title

Granite Shoals ARP Grant Emergency Generators

Physical Address View project details and contacts
City, State (County) Granite Shoals, TX 78654   (Burnet County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $900,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Owner anticipates the scope of work to consist of the following responsibilities: The selected Respondent will be the general contractor for the Project, which is the construction of ARP Grant Emergency Generators. The City anticipates the following items will be included in the scope of the Project: eight (8) permanent backup generators at eight (8) different locations, including concrete foundation, generator automatic transfer switch, diesel fuel tank, elevated access platform, electrical work, conduits, and one (1) portable generator; and all other appurtenances necessary for the complete Project. The Project will be designed and constructed so as to meet all applicable federal, state, and local accessibility standards. The selected Offeror will be also responsible for: obtaining all applicable permits and inspections; providing all necessary performance and payment bonds and insurance certificates; and providing the Owner with all manufacturers' warranties and all operations and maintenance (O & M) manuals for all equipment installed. The selected Offeror may be required to perform some or all of the following pre-construction and construction services. Preconstruction Services may include, but not necessarily be limited to, planning and value engineering the Work. Construction Services may include, but not necessarily be limited to, all work associated with construction, occupancy and warranty of the facilities. Principal items of construction include eight (8) permanent backup generators at eight (8) different locations, including concrete foundation, generator automatic transfer switch, diesel fuel tank, elevated access platform, electrical work, conduits, and one (1) portable generator; and all other appurtenances necessary for the complete Project The City of Granite Shoals has established a target commencement date for construction activities as December 18, 2023. The projected completion date is estimated to be September 8, 2025. The City of Granite Shoals reserves the right to phase the construction of the Project or modify the schedule as needed and determined by the City of Granite Shoals due to modifications in scope. Bid Bond - Each Bid must be accompanied by a certified or cashier's check, or an approved Bidder's bond in an amount not less than 5% of the maximum total bid, payable to the City of Granite Shoals, Texas without recourse, as a guarantee that the Bidder will enter into a contract and execute performance and payment bonds on the forms provided, within ten (10) days after the award of contract Estimated maximum construction budget is approximately $900,000.00

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents