Similar Projects
C Rice Lake, Hammond Avenue Const / Misc / Culvert Replacement
Renovation, Infrastructure
Conception
$750,000 to $1,000,000 est. value
Cumberland, WI 54829

Mondovi - Osseo - Construction / Resurface
Infrastructure
Conception
$4,000,000 CJ est. value
Osseo, WI 54758

Red Barn Wind Farm
Renovation, Infrastructure
Design
$162,000,000 est. value
WI

UW Superior - ESPC - 1 MW Solar Array - University of Wisconsin System - Administration
Infrastructure
Design
$1,651,000 est. value
Superior, WI

O.B. Sherry Park - 3457/3461/3465 Milwaukee Street Demolition and Site Restoration
Demolition, Infrastructure
Bidding
$30,000 est. value
Madison, WI 53714

NS10F02 Maintenance Sluice Gate Replacement
Infrastructure
Bidding
$40,000 CJ est. value
Milwaukee, WI 53203

Public Construction Phase 4 Street Lighting at Westlawn Gardens Phase 2
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Milwaukee, WI 53218

Forest Avenue Reconstruction
Post-Bid
West Bend, WI

2021 Kansas Street - Street and Utility Improvements
Post-Bid
Horicon, WI 53032

North Main Street Watermain Replacement
Results
$300,000 est. value
Verona, WI 53593

2021 Utility and Street Improvements
Results
$980,000 est. value
Algoma, WI

13 Lot Single Family Sub Division
New Construction
Construction
Mequon, WI 53097

Town of Randolph, Sterk Road - Const Ops/ Bridge Replacement
Demolition, New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Cambria, WI 53923

STH 16, 5,800' West of STH 83 STH 190
Infrastructure
Bidding
$2,000,000 CJ est. value
Nashotah, WI 53058

Private Property Infiltration and Inflow Reduction Municipal Contractors
Post-Bid
Milwaukee, WI

Last Updated 07/28/2022 10:10 AM
Project Title

Storm Sewer Construction Warrington Avenue

Physical Address View project details and contacts
City, State (County) Cecil, WI 54111   (Shawano County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $161,839 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 28, 2022 , this project has not yet been awarded. The project is expected to be awarded on August 16, 2022. **As of July 11, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** Storm Sewer Construction Warrington Avenue Village of Cecil OWNER - Village of Cecil hereby gives notice that sealed bids will be received for the following described project PROJECT - The work shall consist of Storm Sewer Construction for S Warrington Avenue General Estimate of Quantities: 820 lineal feet of storm sewer construction All bids shall be addressed to Village of Cecil 111 E. Hofman St.. Cecil. Wl 54111 Bids shall be seated and shall have the name and address of the bidder and the contract for which the bid is being submitted on the outside of the envelope All bidders shall bid in accordance with and upon the bid forms included in the contract documents. No bid shall be received unless accompanied by a certified check or satisfactory bid bond payable to Village of Cecil in an amount not less than 10% of the maximum bid as a guarantee that, if the bid is accepted, the bidder will execute and file the contract, performance/payment bonds and insurance certification, as required by the contract documents, within ten (10) days after the Notice of Award Bid Rejection - The OWNER reserves the right to reject any and all bids, waive any informalities in bidding or to accept the bid or bids which best serve(s) the interests of Village of Cecil. Withdrawal of Bids - No bids shall be withdrawn for a period of sixty (60) days after the scheduled opening without the consent of the OWNER. Governing Laws & Regulations - The contract letting shall be subject to the provisions of Sections 60 77, 66 0901. 985 07. 985 01 of the Wisconsin Statutes This project is NOT subject to prevailing wages Published by the authority of Village of Cecil VILLAGE OF CECIL Shawano County, Wisconsin

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents