Similar Projects
Cole Road to South Ricardo to North Ricardo to Anzar Road - PWB-2105 - San Benito County
Infrastructure
Conception
$674,844 CJ est. value
Aromas, CA 95004

Cole Road to South Ricardo to North Ricardo to Anzar Road - PWB-2105 - San Benito County
Infrastructure
Conception
$674,844 CJ est. value
Aromas, CA 95004

Carr Avenue Bridge Replacement - San Benito County
Demolition, New Construction, Infrastructure
Design
$675,000 CJ est. value
Aromas, CA 95004

Oak Street Residential Subdivision
New Construction, Infrastructure - 7,940 SF
Design
$2,000,000 CJ est. value
Greenfield, CA 93927

Graphic Arts & Nursing Site Improvements
Infrastructure
Bidding
$600,000 CJ est. value
Monterey, CA 93940

Graphic Arts & Nursing Site Improvements
Infrastructure
Bidding
$600,000 CJ est. value
Monterey, CA 93940

Wellness Center at Salinas Education Center Modular Building
New Construction, Infrastructure - 2,400 SF
Sub-Bidding
$700,000 CJ est. value
Salinas, CA 93906

Metal Building PEC / Salinas
New Construction, Infrastructure - 11,949 SF
Sub-Bidding
$750,000 CJ est. value
Salinas, CA 93901

Parking Lot Sweeping and Pressure Washing and or Steam Cleaning Services at the Salina DMV Field Office
Term Contract, Infrastructure
Post-Bid
Salinas, CA 93906

Monte Bella Subdivision Street Sweeping
Infrastructure
Post-Bid
Salinas, CA

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Sacramento Street Road Diet and Rehabilitation Project
Infrastructure
Results
$721,000 CJ est. value
Vallejo, CA 94590

Cooper Road Reconstruction
Renovation
Construction
$4,100,000 CJ est. value
Salinas, CA 93908

CSUMB Aquatic Center - New Equipment Storage Addition
Addition, Demolition, Renovation, Infrastructure
Construction
$457,754 CJ est. value
Seaside, CA 93955

Hotel Durell / Pacific Grove
New Construction, Infrastructure - 68,400 SF
Pending Verification
$12,000,000 CJ est. value
Pacific Grove, CA 93950

Last Updated 02/01/2023 03:05 PM
Project Title

Storm Drain Improvements Phase 1 - Del Monte Boulevard between Coral Street and Esplanade Street - Rebid

Physical Address View project details and contacts
City, State (County) Pacific Grove, CA 93950   (Monterey County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $227,125 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Pacific Grove invites sealed bids for storm drainage improvements along Del Monte Boulevard between Coral St & Esplanade St. The work consists of replacement/installation of storm drain, catch basins, and manholes, including trench pavement and rolled curb and cutter restoration. All bids submitted shall include a completed Proposal, which is included in the Bidder Package. Each bid must be accompanied by Cash, Cashiers Check, Certified Check or Bidders Bond in an amount equal to not less than 10% (ten percent) of the total amount of the bid price. The work performed under this contract must conform to requirements of the project Technical Specifications and Special Provisions, which are described in the Bidder Package Additional charges will be imposed for mailings of plans and specifications. Plans and specifications will not be mailed until payment for materials and postage has been received. A copy ofthe Bidder Package is also on file at the City Clerk s office in City Hall at 300 Forest Avenue and the Central Coast Builders Association (831) 758-1624. The contact for technical questions concerning project plans and specifications is Sherman Low, Neill Engineers Corp., at (831) 624-2110; email address: sherman@neillcorp.com. Questions concerning the bid process and general project information should be directed to Daniel Gho, Public Works Director at (831) 648-5722, ext. 4203; email address: dgho@cityofpacificgrove.org. The project time of completion is thirty (30) working days.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents