Similar Projects
Operations Campus and Facility
New Construction
Conception
Holly Springs, NC

Civic Campus New Civic Tower Phase 1
New Construction - 420,000 SF
Design
Less than $190,000,000 est. value
Raleigh, NC

Renovations to the Don Ellis Building
New Construction, Renovation - 7,000 SF
Design
Less than $1,000,000 est. value
Raleigh, NC 27616

DHHS Department of Health and Human Services Campus Phase I
New Construction - 440,000 SF
Post-Bid
Less than $192,300,000 est. value
Raleigh, NC 27601

Facility Repair & Renewal (FRR) (MATOC) Phase 1
Post-Bid
Less than $450,000,000 est. value
Washington, DC

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Results
$3,000,000 to $15,000,000,000 est. value

D/B Southeast MATOC - Phase 2
Results
$1,000,000 to $170,000,000 est. value

Ferguson Distribution Center
New Construction - 100,000 SF
Construction
$12,900,000 est. value
Holly Springs, NC 27540

Wake County Community Service Center Renovation - Phase II
Renovation
Construction
Raleigh, NC 27608

Fox Road Storage
New Construction - 108,000 SF
Design
$10,000,000 CJ est. value
Raleigh, NC 27616

Secure Construction SATOC
Post-Bid
$100,000,000 est. value
Washington, DC

Multiple Award IDIQ General Construction Award-Presolicitation
Results
$5,000,000 to $10,000,000 est. value

Fit Up for WCPSS Offices - Crossroads I and II
Construction
Less than $3,460,000 est. value
Cary, NC 27519

New Community Recreation Center/Municipal Facility at Cobblestone Development
New Construction - 12,000 SF
Design
$5,000,000 to $8,000,000 est. value
Rolesville, NC 27571

Sources Sought for Job Opportunity Construction Contracts
New Construction
Post-Bid
$2,000 est. value

Reported 06/07/2022 12:00 AM
Project Title

RFQ Construction Manager at Risk - Town of Holly Springs Operations Campus

Physical Address View project details and contacts
City, State (County) Holly Springs, NC   (Wake County)
Category(s) Commercial, Entertainment/Recreation, Government/Public, Sewer and Water
Sub-Category(s) Convention/Exhibit Center, Lift and Pump Stations, Misc. Buildings, Warehouse/Storage
Contracting Method Competitive Bids. Construction Management - CM at Risk.
Project Status Accepting Qualifications, Construction Start Expected September 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Town of Holly Springs, North Carolina (the Town) is soliciting submittals from interested Construction Management at Risk (CMR) firms to provide pre-construction and construction services for the new Operations Campus. The town is seeking a CMR firm with experience in construction of similar projects and the process under NCGS 143-128.1 and other relevant statutes. The proposed campus site is located off of Green Oaks Parkway, on a +/- 30 acres wooded lot (Pin # 0649206441). It is bordered on the east by the Town of Holly Springs Wastewater Treatment Facility, located at 150 Treatment Plant Road, on the north by undeveloped commercial properties, and on the south by Utley Creek. The north and west property lines run parallel to a 20 Duke Energy Access easement (see Exhibit 'A'). The overall Operations Campus project consists of the construction of a new administration building, operations building and warehouse, fleet maintenance building, fueling station, citizens convenience center for yard waste, vehicle storage, truck canopy, storage, and laydown areas, etc. The project will be phased based on cost and may also include renovations (interior upfitting and associated site work) to the Town's existing public works facility, located at 101 Thomas Mills Road, Holly Springs NC 27540. At this time, the Town is authorized to move forward with the work associated with Phase 1 only, as defined in the RFQ. The Town reserves the right to solicit additional statements of qualifications for the future phases. Phase I consists of the construction of a new administration building, operations warehouse, vehicle storage and laydown area, citizens convenient center, truck canopy and associated site work. See Exhibit 'A' for overall site plan. Buildings and structures labeled as future are not included in Phase I. Phase I has an anticipated construction budget of $25 million (or as the budget allows).

Details

Misc. Buildings, New Construction, Warehouse/Storage, New Construction, Lift and Pump Stations, New Construction, Convention/Exhibit Center, New Construction.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Storage Assemblies, Metal Storage Shelving, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Sanitary Sewerage Utilities, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents