Similar Projects
Aiken Golf Facility Upgrades
Renovation
Post-Bid
$250,000 CJ est. value
Graniteville, SC 29829

The Port Royal Racquet Club Tract
Demolition, New Construction, Infrastructure - 180,000 SF
Design
$45,500,000 CJ est. value
Hilton Head Island, SC 29928

Golf Course Maintenance Building and Cart Shelter
New Construction, Infrastructure
Post-Bid
$150,000 CJ est. value
Dillon, SC 29536

USGA Putting Green and Short Game Chipping Area Construction at Greer Golf
Infrastructure
Post-Bid
$197,087 CJ est. value
Greer, SC 29651

Hole #9 - Green Relocation
Infrastructure
Post-Bid
$225,000 CJ est. value
Conway, SC 29526

PopStroke / Myrtle Beach
New Construction, Infrastructure
Pending Verification
$7,300,000 CJ est. value
Myrtle Beach, SC 29577

Pickens Resort & Clubhouse
New Construction, Infrastructure - 8,750 SF
Post-Bid
$4,000,000 CJ est. value
Pickens, SC 29671

Golf Cart Preventative Maintenance and Repairs
Term Contract
Post-Bid
Columbia, SC

Last Updated 07/03/2023 03:35 PM
Project Title

RFQ Construction Management Services - Crowfield Golf Clubhouse Improvements

Physical Address View project details and contacts
City, State (County) Goose Creek, SC 29445   (Berkeley County)
Category(s) Entertainment/Recreation
Sub-Category(s) Golf Course
Contracting Method Competitive Bids
Project Status All Submissions Received, Selection Underway, Request for Qualifications, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

We are seeking to hire a qualified contractor to provide preconstruction and construction management services for improvements at the Crowfield Golf Clubhouse. We have retained the services of The Middleton Group to develop the design and construction documents to be used as the basis of the design. The specific scope of work for the selected for the Project will be defined in the construction management agreement. However, at a minimum the following services are required of the contractor: Provide preconstruction phase services including cost estimating, life-cycle cost analysis, value engineering, constructability reviews, scheduling, phasing plans, etc. Provide and maintain Request For Information ("RFI") and submittal logs Develop and maintain a master project schedule Prepare and maintain a cash flow analysis Define and prepare scopes of work for bid packages Develop a site management plan Provide construction management and general contracting services Develop a phasing and sequencing plan Establish and maintain quality control standards Provide lump-sum pricing for the project PROJECT SCHEDULE The contractor is expected to commence preconstruction services late 2nd quarter of 2023 toearly 3rd quarter of 2023 Loctaion- 300 Hamlet Cir Goose Creek, SC 29445

Details

Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Lockers, Flagpoles, Flags and Banners.
Division 22 - Plumbing, Facility Sanitary Sewerage, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Clearing and Grubbing, Earth Moving, Grading, Excavation and Fill.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting Irrigation, Planting Preparation, Turf and Grasses, Plants, Planting Accessories.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Utility Water Drains, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents