Similar Projects
2021 Water Main Replacement Dewey Avenue and Option 1 Hobson Avenue
Bidding
Newport, RI 02878

Improvements to Water System - Mechanic Street and Old Great Road
Post-Bid
North Smithfield, RI

Miscellaneous Construction and Repairs
Term Contract
Post-Bid
Portsmouth, RI 02871

Repair Work to Water Mains No.24003 and 23500
Term Contract
Results
Providence, RI 02903

Pipe Fittings and Valves
Term Contract
Results
Newport, RI

Diamond Hill Road Water Main Replacement
Post-Bid
Cumberland, RI 02864

Installation of Water Main - Logee Street
Results
Woonsocket, RI

Pulsar Chlorinator Replacement
Post-Bid
Lincoln, RI 02865

ADS Pipe
Term Contract
Results
Narragansett, RI 02882

USCG STA Castle Hill Underground Water Leak Newport, RI
Post-Bid
Newport, RI

Cleaning and Lining Water Mains Blackstone
Results
Providence, RI

Cleaning and Lining Water Mains Auburn Area
Results
Cranston, RI

Replacement Rehab Water Mains Charles Area
Results
Providence, RI

Water Distribution System Improvements Main Replacement - MR-11
Results
Less than $4,049,893 est. value
Pawtucket, RI

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Last Updated 09/04/2020 07:11 AM
Project Title

BCWA and EP Transmission System Improvements for Emergency Supply

Physical Address View project details and contacts
City, State (County) Warren, RI 02885   (Bristol County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency - 07/23/20
Owner View project details and contacts
Architect View project details and contacts
Description

Transmission System Improvements for Emergency Supply, consisting of water transmission main installation in East Providence, RI. The work under this Contract includes but is not limited to: 1. Installation of approximately 10,600 linear feet of 4” – 30” ductile iron water main 2. Installation of (10) 4”-12” gate valves 3. Installation of (23) 24”-30” butterfly valves and associated manhole structures 4. Installation of meter station 5. Installation associated water appurtenances.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents