Similar Projects
J041--Quarterly Maintenance (4 York Chillers)
Term Contract
Bidding
Columbus, OH 43219

CCS Phase 13A HVAC Renovations - MEP
Alteration
Bidding
Columbus, OH

MERV Filters for CML HVAC Equipment
Post-Bid
Columbus, OH 43215

HVAC and Mechanical Preventative Maintenance
Term Contract
Post-Bid
Columbus, OH 43215

Chiller Preventative Maintenance - 1
Term Contract
Results
Less than $35,682,695 est. value
Columbus, OH 43215

Chiller Preventative Maintenance - 2
Term Contract
Results
Less than $35,682,695 est. value
Columbus, OH 43215

Air Cleaning Devices
Term Contract
Post-Bid
Columbus, OH

Chiller Preventative Maintenance - 3
Term Contract
Results
Less than $35,682,695 est. value
Columbus, OH 43222

Filter Replacement Service
Post-Bid
Columbus, OH 43211

Variable Refrigerant Flow Equipment Preventative Maintenance
Term Contract
Results
Less than $327,660 est. value
Columbus, OH 43207

HVAC and Mechanical Products
Term Contract
Post-Bid

Installation of Infrared Heaters Building 43 Defense Supply Center
Results
$100,000 to $250,000 est. value
Columbus, OH 43213

DLA Bldg. 10 & 11
Post-Bid
$1,000,000 to $5,000,000 est. value
Columbus, OH

Replacement of a Existing Roof Top Unit
Results
Upper Arlington, OH 43321

Ohio National Guard Controlled Humidity Protection
Post-Bid
$50,000 to $80,000 est. value
Columbus, OH 43235

Last Updated 02/25/2022 10:21 AM
Project Title

PCAir Replacement for Passenger Boarding Bridge at Gates B21 and C47

Physical Address View project details and contacts
City, State (County) Columbus, OH 43219   (Franklin County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $255,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of Supply and replace two (2) 45 ton Pre-Conditioned Air Units with pre-cool, hoses and hose racks at Gates B21 and C47 at John Glenn International Airport.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents