Similar Projects
Last Updated | 06/12/2021 12:59 AM |
Project Title | Installation of New Advances Traffic Management System (ATMS) on Various Routes Throughout District 3 |
Physical Address | View project details and contacts |
City, State (County) | State-Wide: IL |
Category(s) | Heavy and Highway |
Sub-Category(s) | Traffic Signalization |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 67100100 L Sum Mobilization Base Items 1.000 70102635 L Sum Traffic Control And Protection, Standard 701701 Base Items 1.000 80500100 Each Service Installation, Type A Base Items 4.000 85700300 Each Full-Actuated Controller And Type V Cabinet Base Items 3.000 85700310 Each Railroad, Full-Actuated Controller And Type V Cabinet Base Items 8.000 86200200 Each Uninterruptable Power Supply, Standard Base Items 11.000 88500500 Each Induction Loop Detector Amplifier Base Items 85.000 89100400 Each Illuminated Sign, Led Base Items 24.000 X0323071 Each Spare Full Actuated Controller, Special Base Items 18.000 X0326248 L Sum Atms Software (Core Module) Base Items 1.000 X0326266 Each Ethernet Switch Base Items 11.000 X1400351 Each Wood Pole, 35 Ft, Class 4 Base Items 4.000 X1400399 Each Video Detection System Complete Base Items 3.000 X1400440 Each Ethernet Converter Base Items 24.000 X8050115 Each Service Installation, Type A (Modified) Base Items 7.000 X8570215 Each Full-Actuated Controller In Existing Cabinet Base Items 104.000 |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |