Similar Projects
Multiple Award Task Order Contract (MATOC) ($300M) for Construction Phase Services (CPS) for the US. Army Corps of Engineers, South Pacific and Southwestern Divisions in support of the Border Infrastructure Program
New Construction
Design
Less than $300,000,000 est. value

D/B Western MATOC
Design
$1,000,000 to $70,000,000 est. value

Defense Health Agency - Medical Facility Operations and Maintenance
Bidding
$2,500 to $90,000,000 est. value

Job Order Contract (JOC) Facility Modifications, Repair and Maintenance
Renovation
Post-Bid
Tucson, AZ

Multiple Award Task Order Contract (AZ/NM/TX/OK)
Post-Bid
$2,000 to $40,000,000 est. value

Army Mechanical MATOC
Results
Less than $2,000,000 est. value

Air Force Contract Augmentation Program (AFCAP) V
Results

Pacific West Area Indefinite Quantity Contract for Construction Services
Design
$2,000 to $25,000,000 est. value

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Post-Bid
$3,000,000 to $15,000,000,000 est. value

Building 40 Renovation, 162 Air National Guard, Tucson, AZ
Renovation
Results
$5,000,000 to $10,000,000 est. value
Tucson, AZ 85706

Access Control Point Program Design Build II -- RFI(2)
Design

Gladden Farms Postvale Corridor
Post-Bid
Marana, AZ

Architect/Engineering Services for the New Administration Complex
New Construction - 20,000 SF
Results
$5,000,000 to $7,000,000 est. value
Tucson, AZ

MATOC Construction Project - New Procurement - VISN 22
Design
$2,000 to $20,000,000 est. value

Construction Inspection IDIQ
Post-Bid
$50,000 to $17,500,000 est. value

Reported 01/23/2021 12:00 AM
Project Title

Construction Management Services for The Expansion & Modernization Project at The San Luis I Land Port of Entry

Physical Address View project details and contacts
City, State (County) San Luis, AZ   (Pima County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value Greater than $100,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Expansion and modernization project is currently being developed by the GSA. The potential project will involve both new construction and renovation of existing facilities, and includes but is not limited to the following primary scope of work elements: Relocated and expanded Northbound Lanes and associated Pre-Primary, Primary and Secondary inspection facilities and Headhouse Building. Southbound Lanes and associated Processing Building and Canopies. Seizure Vault and Impound Lot. Family/UAC Holding building. Utility Yard including Water Treatment Plant and Emergency Generator. Main Building. Expanded Pedestrian Processing. Kennels. Public Facing Building. Parking. Site development and infrastructure. Demolition of existing facilities except for the new North Annex.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Storm Drainage Structures, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents