Similar Projects
Last Updated | 03/06/2023 09:05 AM |
Project Title | Beaver Brook #3 Flow Meter |
Physical Address | View project details and contacts |
City, State (County) | Clinton Township, NJ 08801 (Hunterdon County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $78,900 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work consists of the removal of existing flow meter equipment and piping within an existing concrete chamber, installation of temporary bypass pumping to divert flow away from the meter chamber during construction activities, installation of a new Palmer-Bowlus flume prefabricated arrangement, adapting fittings and connections, electrical and instrumentation work, installation of a mid-span concrete support, startup and restoration work. The work is located within a residential easement area off of Westgate Drive within the Township of Clinton. The work shall be completed within 90 calendar days of the Contractor's receipt of written Notice to Proceed. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |