Last Updated | 07/18/2023 10:07 AM |
Project Title | Southwest Water Treatment Plant Sedimentation Basin Improvements |
Physical Address | View project details and contacts |
City, State (County) | Madison, AL 35756 (Limestone County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Bidding, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $525,000 [brand] Estimate |
Plans Available from | Mechanical Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project is generally described as follows: demolition of concrete masonry unit baffle walls in basins 1 and 2; replace baffle walls with 304 Stainless Steel baffle walls; demolition of existing sludge collection system for 4 basins; install new hose-less sludge collection system in each basin; demolition of existing lime silos and piping; construct new fluoride storage tank area with double wall tank; remove selected existing chemical storage tank; provide new chemical storage tanks as described in the specifications and contract drawings. The work shall be performed according to the plans and specifications. All questions should be submitted to Miranda Duke at Miranda.Duke@hsvutil.org. As part of the prequalification process, prospective. Bids will be accepted only from qualified General Contractors licensed by the State of Alabama. Only bids of such Contractors who are licensed by the State of Alabama prior to the date of the bid opening will be considered. The Project is generally described as follows: demolition of concrete masonry unit baffle walls in basins 1 and 2; replace baffle walls with 304 Stainless Steel baffle walls; demolition of existing sludge collection system for 4 basins; install new hose-less sludge collection system in each basin; demolition of existing lime silos and piping; construct new fluoride storage tank area with double wall tank; remove selected existing chemical storage tank; provide new chemical storage tanks as described in the specifications and contract drawings. The work shall be performed according to the plans and specifications. A cashier's check or a bid bond payable to the City of Huntsville, Alabama, d/b/a/ Huntsville Utilities for an amount not less than 5% of the contractor's bid, but in no event more than $10,000.00, will be required to accompany each contractor's bid. Performance and Payment bonds are required for this project. The right to reject any and all bids is reserved. All questions should be submitted via email to miranda.duke@hsvuti1.org by April 7, 2023, close of business. The project consists of improvements to the Huntsville Utilities Southwest Water Treatment Plant. This list is not all inclusive, but in general work will include the following: o Demolish cmu baffle walls in Basins 1 and 2 and replace with 304 SS o Demolish existing sludge collection system and install new hose-less sludge collector system in each basin. o Demo existing lime silos and piping. Construct new fluoride storage tank area with double walled tank. o Remove existing and provide new chemical storage tanks |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |