Similar Projects
ADA Surveys / Improvements, Boise State University
Infrastructure
Bidding
$450,000 est. value
Boise, ID 83725

Construction of Concrete Curb, Gutter, and Sidewalk
Term Contract
Bidding
$500,000 est. value
Inkom, ID

Main Street Sidewalk ADA Ramps
Alteration
Post-Bid
Lapwai, ID

Parking Lot and Utilities Demolition
Infrastructure
Post-Bid
Coeur d'Alene, ID 83814

Idaho Community Development Block Grant
New Construction, Infrastructure
Results
$175,174 est. value
Moscow, ID 83843

Pedestrian Path Connection Plan
Infrastructure
Results
$250,000 to $500,000 est. value
ID

Replacement of Concrete
Infrastructure
Post-Bid
Harrison, ID

Adding Bicycle Land Updating Sidewalks
Infrastructure
Results
$10,000,000 to $15,000,000 est. value
Bonners Ferry, ID

2022 Waterline Surface Repair
Infrastructure
Post-Bid
Idaho Falls, ID

Sixth Street Pedestrian Improvements
Infrastructure
Results
$1,000,000 to $2,500,000 est. value
ID

Creason Pathway Construction
Infrastructure
Post-Bid
Meridian, ID

Christine St, Northview St To Ustick Road
Alteration
Results
$1,100,000 est. value
ID

Brick Plaza Replacements
Infrastructure, Alteration
Post-Bid
$268,000 est. value
Boise, ID 83725

Hawkins Loop Trail Build
Infrastructure
Results
ID

Ketchum Sidewalks Infill 2022
Infrastructure
Post-Bid
$400,000 est. value
Ketchum, ID

Last Updated 05/18/2022 07:23 AM
Project Title

Parking Lot Improvements, Maggie Creek

Physical Address View project details and contacts
City, State (County) Kamiah, ID 83536   (Lewis County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $434,640
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work of this project can be summarized to include clearing and grubbing, asphalt pavement saw cut, asphalt pavement removal and disposal, concrete curbing and sidewalk removal and disposal, subgrade reshaping and/or removal and disposal, installation of pavement underdrain and storm water structures, preparation of modified subgrade, preparation and installation of new asphalt pavement section, preparation and installation of new concrete curbing, sidewalk and ADA ramp, ADA striping, ADA signage, parking stall striping, traffic striping, truncated domes, storm water ditch, surface repair, and installation of erosion control measures during construction to clearing and grubbing, asphalt pavement saw cut, asphalt pavement removal and disposal, subgrade reshaping and/or removal and disposal, preparation of modified subgrade, preparation and installation of new asphalt pavement section, surface repair, parking stall striping, traffic striping, and installation of erosion control measures during construction.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents