Similar Projects
Oxford Drive Water Main and Drainage Improvements
Bidding
Bradenton, FL 34205

Lido Key Hurricane Storm Damage Reduction Project Sarasota County, Florida
Post-Bid
$20,000,000 to $30,000,000 est. value
Sarasota, FL 34230

FY19 Seawall Restoration at Marina Drive - 56th Street
Post-Bid
$160,000 est. value
Holmes Beach, FL

North River Ranch Phases 1B and 1D East
Results
Sarasota, FL 34230

Misc Concrete and Drainage Repairs
Results
Less than $240,271 est. value

FY19 Seawall Restoration at Marina Drive - 67th Street
Post-Bid
$160,000 est. value
Holmes Beach, FL

Clean and Reshape Ditches
Results
Less than $196,561 est. value

Lake Bank Repairs
Post-Bid
FL

Shore Protection Project, Anna Maria Island, Beach Renourishment 2020, Manatee County, Florida
Results
$15,000,000 to $25,000,000 est. value
Anna Maria, FL

Manatee High School Safety Improvements (North)
Post-Bid
Bradenton, FL 34201

Lido Key Hurricane and Storm Damage Reduction Project
Results
$10,000,000 to $25,000,000 est. value
Sarasota, FL

Presidio and Riviera Drainage Improvements
Post-Bid
Lakewood Ranch, FL 34202

Miscellaneous Concrete and Drainage
Results
Less than $240,271 est. value

Presidio and Riviera Drainage Improvements, CDD5
Post-Bid
Lakewood Ranch, FL

Revetment Block Installation (MBC)
Results
Less than $75,000 est. value
FL

Last Updated 04/14/2020 07:21 AM
Project Title

Oak Street Drainage Improvements Braden River Watershed Oak Street from Hubbel Road to Pin Street

Physical Address View project details and contacts
City, State (County) Bradenton, FL 34206   (Manatee County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $375,000 to $382,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work is generally described as removal and replacement of two existing stormwater outfalls under Oak Street with one-way check valves by open cut method, construction of Gabion wall and maintenance access area, clear and grub of existing vegetation, and regrade of existing stormwater ditches. Construction of concrete pads at the downstream end of the new pipes is also included. Existing water main and sanitary lines in conflict will be modified and remain operable post construction with disinfection, testing, and other appurtenances and materials

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents