Similar Projects
Last Updated | 06/25/2020 02:24 AM |
Project Title | Power Meter Integration, Austin District |
Physical Address | View project details and contacts |
City, State (County) | Austin, TX 78753 (Bastrop, Blanco, Burnet, Caldwell, Gillespie, Hays, Lee, Llano, Mason, Travis, Williamson Counties) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $39,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Site No: 149720, 149014, 149927, 149041, 149015, 149001, 149719, 149716, 149884, 149721, 149724, 149000, 149926, 149712, 149925, 149722, 149718 Project Locations: a. Austin Dhq Fuel 7901 n Ih 35, Austin, Tx. b. Austin Dhq Bldg. #6 7901 n Ih 35, Austin, Tx. c. Travis n Maintenance 2001 Whitestone, Cedar Park, Tx.78613 d. Travis e. Maintenance 8902 Fm 969, Austin Tx. 76724 e. Travis n. Aem 1001 East Parmer Lane, Ste b, Austin, Tx 78753 f. Travis s. Maintenance 12315 Us 290 West, Austin, Tx 78737 g. Travis s. Aem 9725 s. Ih35, Austin, Tx. 78744 h. Bastrop Aem 174 Sh 21 East, Bastrop, Tx 78602 i. Burnet Aem 3029 Sh 29 East, Burnet, Tx 78611 j. Fredericksburg Maintenance 1623 e Main Street, Fredericksburg, Tx 78624 k. Georgetown Aem 2727 South Austin Ave, Georgetown, Tx 78627 l. Johnson City Maintenance 608 Us 281 s, Johnson City, Tx 78636 m. Lincoln Maintenance 3391 West Sh 21, Lincoln, Tx 78948 n. Llano Maintenance 2504 Sh 16 So, Llano, Tx 78643 o. Lockhart Maintenance 1315 n Blanco St, Lockhart, Tx 78644 p. Mason Maintenance 2424 Sh 29 East, Mason, Tx 76856 q. San Marcos Maintenance 1710 Hwy 21, San Marcos, Tx 78666 r. Taylor Maintenance 3101 West 2nd Street, Taylor, Tx 76574 Provide and install Veris E50 power meter or approved TXDOT equal to integrate into existing Blue Pillar Monitoring System. Meter and associated CT's, fusing, and mounting hardware to be connected to the load side of associated ATS. After successful installation, meter will be configured through Blue Pillar programming for live monitoring. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |